My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.5. ERMUSR 08-14-2007
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2003-2013
>
2007
>
08-14-2007
>
6.5. ERMUSR 08-14-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2009 3:19:11 PM
Creation date
3/23/2009 3:19:11 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
8/14/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Proposed GRE DSM rates, in millslkwh <br />Note -the effective rate, not credit is shown <br />Year <br /> 2007 2008 2009 2010 2011 2012 <br /> <br />ETS water & space 16.5 18.0 19.5 21.0 22.5 24.0 <br />Peak Shave water 21.5 23.1 24.7 26.3 27.9 29.5 <br />Dual Fuel 19.5 21.3 23.1 24.9 26.7 28.5 <br />Rate structure change effective for 2008 <br />Eliminate base and growth rate design. <br />Replace flat energy rate with on-peak, off-peak, and critical peak energy pricing <br />Example: 2007 GRE rates restated in new structure <br />Generation Price Units Comments <br /> Sprin /fall 4.11 $/kw <br /> Winter 8.22 $/kw <br /> Summer 12.33 $/kw <br />Ener <br /> Off- eak 0.02477 $/kwh <br /> On-peak 0.03880 $/kwh on-peak = 10AM - 8PM Mon-Fri <br /> Critical Peak 0.09596 $/kwh Max 80 hours per year <br /> <br />Transmission & anc. $4.75 $/kw <br />2008 GRE rates <br />Not available yet. Assume 8.5% increase for planning purposes <br />
The URL can be used to link to this page
Your browser does not support the video tag.