My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ERMUSR MISC 08-14-2007
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2003-2013
>
2007
>
08-14-2007
>
ERMUSR MISC 08-14-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2009 3:16:57 PM
Creation date
3/23/2009 3:16:56 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
8/14/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Renewables <br />• The CapX 2020 projects are a major step in meeting the state of Minnesota's 25 x 25 <br />renewable energy standard <br />• In addition to increased electric reliability, CapX 2020 will benefit Minnesota and the <br />surrounding region by expanding the generation outlet for wind energy, particularly in <br />southern and southwestern Minnesota and the Dakotas. <br />• The locations of CapX 2020 proposed transmission lines capitalize on the consistent and <br />strong winds in southern and southwestern Minnesota, enabling the delivery of wind <br />energy throughout the state. <br />• As part of Minnesota's new renewable energy standard utilities are required to examine <br />in a five year action plan how to develop the transmission upgrades needed to support <br />the 25 x 25 mandate <br />• Under Minnesota's renewable energy standard CapX2020 partner Xcel Energy is <br />required to have 30 percent of its retail sales from renewables by 2020, with 25 percent <br />of the total to be from wind. <br />7/19/07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.