Laserfiche WebLink
<br /> 2006 Line Extension Survey <br /> Does utility Does utility <br />Does utility charge charge capitalize new Is the <br />developers or developers or Does utility construction capitalized <br />customers for residential charge infrastructure price minus <br />components that customers commercial/ improvements the developers <br />make up primary secondary industrial during the current or customers <br />distribution service from customers year of contribution or <br />infrastructure If yes, what is charge transformer to If yes, what is charge for service If yes, what is charge construction or total cost of the <br />City/Utility system based on the customer based on upgrades based one others project <br />for the current total cost of <br />Ada No No No <br />_ vear oroiect <br />charge for secondary <br />wire up to the meter <br />Aitkin <br />cost of installation Yes <br />No <br />construction is <br />capitalized at the <br />customer or developer <br />pays installation from <br />transformer to <br />Yes <br />Alexandria _ _ No Yes customer No time it is complete Total cost <br />Base on feasibility <br />study with 10% hurde Customer hires <br />Austin Yes rate No electrician to install Yes Feasibility study End of year Total cost <br />Benson _ No No No current year total cost <br />new developments <br />have been <br />underground and <br />customer is <br />responsible for the <br />Utility has contracted service lateral. Utility <br />out large only does the <br />developments and the connecting and <br />developer pays for all charges a connection KVA Charge <br />Biwabik Yes the cost involved No fee for this. Yes $.30/KVA every month Yes No <br />customer installs 80% of cost <br />wiring from associated to <br />transformer or customer upgrade <br />pedestal to service on paid by customer and Total cost of <br />Blooming Prairie No Yes house Yes 20% paid by utilities Current year project <br />overhead is free, <br />underground paid by cap in current year <br />Blue Earth No Yes customer No of construction net cost <br />customer pays for <br />underground service Begin <br />installed from utility's depreciation <br />secondary to their beginning of year <br />Detroit Lakes No No home No after construction Minus <br />Dundee No Yes cost to city No No <br />No, but do If a change in the <br />Basic charge of $125 bill a customer's facility Total cost of <br />for 1st 100 ft of 200 monthly requires relocation of project, <br />amp underground plus facility existing primary including <br />$1.25 per foot for each charge to service to transformer design and <br />ft over 100 ft. This large and it is in a dedicated Capitalized when inspection, <br /> covers a partion of the commercial easement, then may placed into regardless of <br /> cost of the and charge actual cost to commercial the funding <br />East Grand Forks No Yes under round cable industrial relocate service source <br />Elbow Lake No No No Yes <br /> $320/lot for developer, <br /> $700/lot for home Included in charge for Total cost of <br />Elk River Yes builder Yes primary Yes bill for 100% costs when completed project <br />Fairfax No No No Asset life total cost <br />flat service charge <br />plus cost of wire from <br />property line if <br />purchased from utility. <br />Additional charge if <br />secondaries need to <br />be extended more during current <br />than 100 ft to property Service size and year of Total cost of <br />. airmont No Yes line from transformer Yes volts a required construction the project <br /> yes, during current Developer/cust <br /> year of omer doesn't <br />Fosston No No No construction contribute <br />