Laserfiche WebLink
1Ziver <br /> <br />MEMORANDUM <br /> <br />TO: <br /> <br />Mayor and City Council <br /> <br />FROM: <br /> <br />Phil Hals, Street/Park Superintendent <br /> <br />DATE: <br /> <br />February 28, 2003 <br /> <br />SUBJECT: YAC fields 5 & 6, 2002 Construction <br /> <br />In September of 2000, a local contractor graded, leveled, and spread topsoil- <br /> NSP Funds <br /> <br />$11,650.00 <br /> <br />In May of 2001, final dirt work was contracted- <br /> <br />NSP Funds $ 2,650.00 <br /> <br />In 2002, Street/Park employees leveled, rom-tilled and fine graded the two ball fields. They also <br />installed a storm sewer line, irrigation equipment, and seeded the grass. <br /> <br />The 2002 Park Dedication expenditures to date have been: <br /> <br />· Irrigation Equipment $8,581.32 <br />· Grass Seed 1,491.00 <br />· Fertilizer 225.00 <br />· Storm Sewer Pipe 3,861.00 <br />· Storm Sewer Install by Big Jon's 624.00 <br />· Equipment: Un/ted Rental 743.00 <br />· Equipment: Greenberg's Rental 320.'00 <br /> <br />$15,845.36 <br /> <br />2002 City Donations to date: · Labor - storm sewer and irrigation install - 266 hrs. ~ $25/hr <br /> · Tractor - rotorilllng, leveling, dragging & seeding - 180 hfs ~ $40/hr <br /> · Grader - leveling - 63 hrs. ~ $75/hr <br /> · Loader - Additional topsoil - 90 hrs. ~ $90/hr <br /> · Tracks - additional topsoil - 64 hrs. ~ $32/hr <br /> · Surveying - 20 hrs. ~ $32/hr <br /> <br />$ 6,650.00 <br />7,200.00 <br />4,725.00 <br />8,100.00 <br />$ 4,800.00 <br />640.00 <br /> <br />$32,115.00 <br /> <br />Cost of YAC fields #5 & #6 to date $62,260.36 <br /> <br /> <br />