Laserfiche WebLink
Elk River .~ <br />Municipal Utilities <br />13069 Orono Parkway <br />Elk River, MN 55330 <br />March 9, 2007 <br />To: Elk River Municipal Utilities Commission <br />Jerry Takle <br />Jerry Gumphrey <br />Jim Tralle <br />From: Bryan Adams <br />Subject: Underground Electric Cable Bids <br />phone: 763.441.2020 <br />Fax: 763.441.8099 <br />On March 8, 2007 bids were received to install the two underground feeders from the <br />new Waco Substation to the United Health Group data center facility. Attached is a bid <br />tabulation reflecting the bid results. Our cost estimate was $255,000. The apparent low <br />bidder is Michels Pipeline Construction at $142,186 and they are very capable of doing a <br />good installation job. Staff recommends the contract be awarded to Michels Pipeline <br />Construction. <br />