My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.2. ERMUSR 03-20-2007
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2003-2013
>
2007
>
03-20-2007
>
5.2. ERMUSR 03-20-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/20/2009 2:59:41 PM
Creation date
3/20/2009 2:59:41 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
3/20/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Elk River .~ <br />Municipal Utilities <br />13069 Orono Parkway <br />Elk River, MN 55330 <br />March 9, 2007 <br />To: Elk River Municipal Utilities Commission <br />Jerry Takle <br />Jerry Gumphrey <br />Jim Tralle <br />From: Bryan Adams <br />Subject: Underground Electric Cable Bids <br />phone: 763.441.2020 <br />Fax: 763.441.8099 <br />On March 8, 2007 bids were received to install the two underground feeders from the <br />new Waco Substation to the United Health Group data center facility. Attached is a bid <br />tabulation reflecting the bid results. Our cost estimate was $255,000. The apparent low <br />bidder is Michels Pipeline Construction at $142,186 and they are very capable of doing a <br />good installation job. Staff recommends the contract be awarded to Michels Pipeline <br />Construction. <br />
The URL can be used to link to this page
Your browser does not support the video tag.