My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.2. ERMUSR 02-20-2007
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2003-2013
>
2007
>
02-20-2007
>
5.2. ERMUSR 02-20-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2009 1:27:26 PM
Creation date
3/19/2009 1:27:25 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
2/20/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Letter Agreement between <br />Great River Energy and Elk River Municipal <br />Utilities for Joint Use of the new Waco Substation <br />Site <br />THIS AGREEMENT is dated this '~-~ day of ~~~"`~~'~`~2007, <br />between Great River Energy (hereinafter referred to as "GRE"), a Minnesota <br />cooperative corporation, and Elk River Municipal Utilities (hereinafter referred to <br />as "ERMU"), a Minnesota municipal corporation, both whom may be referred to <br />individually as "Party", or collectively as "Parties". <br />RECITALS <br />WHEREAS, GRE intends to build a future new bulk transmission <br />substation called Waco Substation (the "Substation"), and <br />WHEREAS, ERMU desires to construct at the Substation site a <br />"Distribution Substation" in the 2007 timeframe for the purpose of ERMU load <br />serving needs, and <br />WHEREAS, GRE is seeking to purchase approximately 5 acres of land for <br />the Substation site, and <br />WHEREAS, GRE and ERMU have agreed to such joint use of the <br />Substation site, and <br />NOW THEREFORE, the Parties agree as follows: <br />GRE shall purchase and retain ownership of approximately five (5) acres of <br />land for the Substation site, to be located at S25, T33N, R27W, Sherburne <br />County, Minnesota. GRE anticipates closing on the land purchase on <br />January 19, 2007. <br />2. The ERMU owned Distribution Substation shall occupy one (1) acre of land <br />on the SE corner of the five (5) acre Substation site. See the attached plot <br />plan, "Waco Substation, drawing number S274-10D, dated 8-17-06." <br />3. GRE shall grant to ERMU rights to occupy the Distribution Substation site. <br />ERMU shall have rights to construct, own, operate, maintain, and reconstruct <br />as necessary, facilities applicable to the stated Distribution Substation. The <br />term of this occupation shall coincide with the term of this Agreement, as <br />specified in provision 7, below. <br />4. In acknowledgement of the occupation arrangement agreement stated in <br />provision 3, above, ERMU shall make cone-time payment to GRE, due within <br />
The URL can be used to link to this page
Your browser does not support the video tag.