My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-19-1991 LIB MIN
ElkRiver
>
City Government
>
Boards and Commissions
>
Library
>
Library Minutes
>
1990-1999
>
1991
>
03-19-1991 LIB MIN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2010 3:47:50 PM
Creation date
3/18/2009 3:48:02 PM
Metadata
Fields
Template:
City Government
type
LIBMIN
date
3/19/1991
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF ELK RIVER <br />NOTICE OF REQUEST FOR PROPOSALS <br />FOR ARCHITECTURAL SERVICES FOR LIBRARY EXPANSION PROJECT <br />I. BACKGROUND: <br />The City of Elk River has worked with Eos Architecture in <br />the development of a project proposal for the public <br />library expansion. This project proposal was completed in <br />August, 1992. (See attachments.) <br />In 1993, the City worked with Eos Architecture in the <br />development of a concept design for the project expansion <br />and in the preliminary project cost estimates. (See <br />attachments.) <br />II. SCOPE OF PROJECT: <br />It is the goal of the City of Elk River to hire an <br />architect for the library expansion project before the end <br />of 1993, to break ground on the project in the <br />spring/summer of 1994, and to have the project completed <br />before winter, 1994. <br />The library expansion project has a maximum budget <br />(excluding FF&E) of $550,000 and calls for an expansion of <br />approximately 4,100 square feet along with some <br />renovations in part of the existing facility. <br />III. PROPOSED FORMAT: <br />Architectural firms submitting proposals for the library <br />expansion project must provide information on the firm's <br />experience and background in library construction, library <br />expansions, and renovations. References are required <br />along with a statement on the fees proposed for this <br />project. Information is also required on the proposed <br />level of service that will be provided by the <br />architectural firm, from the point of hiring to the <br />occupancy of the library expansion. A timetable should be <br />submitted outlining target dates for the completion of the <br />necessary steps for occupancy of the library expansion to <br />take place before winter of 1994. This timetable should <br />include the full range of architectural services from <br />preliminary design work, production of construction <br />documents, bidding of the project, and through <br />construction administration. The City is especially <br />interested in information related to construction <br />administration including the anticipated number of <br />meetings with the contractors, site visits, reports <br />submitted to the City project manager, and updates to the <br />Library Board. <br />
The URL can be used to link to this page
Your browser does not support the video tag.