Laserfiche WebLink
October 19, 1993 <br />ELK RIVER LIBRARY <br />ADDITION AND REMODELING <br />SCHEMATIC DESIGN <br />PRELIMINARY PROJECT COST ESTIMATE <br />--------------------------------------------------------------- <br />DEMOLITION 7,800.00 <br />SITEWORK 12,000.00 <br />FOUNDATION 28,400.00 <br />EXTERIOR WALLS 39,000.00 <br />WINDOWS 12,000.00 <br />DOORS 4,000.00 <br />SUPER STRUCTURE 27,300.00 <br />ROOF 30,600.00 <br />INTERIOR WALLS/FINISHES 19,000.00 <br />CASEWORK 23,200.00 <br />MECHANICAL 43,500.00 <br />ELECTRICAL 36,500.00 <br />RENOVATION <br />Architectural 36,600.00 <br />Mechanical 6,700.00 <br />Electrical 11,900.00 <br />Subtotal 338,500.00 <br />10~ Estimating Contingency 33,800.00 <br />General Conditions (8~) 27,100.00 <br />Overhead and Profit (12~) 40,_600.00 <br />TOTAL CONSTRUCTION <br />CONSTRUCTION CONTINGENCY (7~) <br />REIMBURSABLES <br />TESTING <br />SURVEY <br />F.F.E. <br />ADMINISTRATIVE COSTS <br />ARCHITECTURAL FEES <br />440,000.00 <br />30,800.00 <br />7,000.00 <br />3,000.00 <br />PROJECT COST <br />