Laserfiche WebLink
Doors in the Community Room -called the door company 8/5/08 -they <br />called back 8/10/08 -I recalled 8/19/08 about repair schedule. <br />Cabinets -called the cabinet company about: <br />Cutting down the front counter so they filing cabinets fit properly <br />Adding drawer extensions <br />Finishing the trim on the slatwall <br />Putting the fridge were it belongs <br />Building a cabinet around exposed pipes <br />Received an estimate of $766.00 to do all repairs -need board approval to <br />proceed. <br />Ballasts have been installed on the tables in the reference area by Andy's <br />Electric 8/19/08. We have a bad switch on one table and are missing the <br />channel for the cables. Called the manufacturer on 8/19/08 waiting to hear <br />back from them. <br />Miska Electric replaced the ballast for the light in the front entrance <br />Patio Completion -Pavers and landscaping have been completed and tables <br />and chairs have been added. <br />New Business <br />Internet Stations -Great River Regional Library installed all new Internet <br />Stations with Flat Screen Monitors. Thanks to a purchase from the Friends <br />of the Library a new circulation terminal was installed in the workroom. We <br />only have enough voice lines for one more Internet station. <br />Coffee Shop Hours <br />Please notify Mick (763.441.1641) if you're unable to make the meeting. <br />