My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1. PCSR 08-14-2006
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2006-2010
>
2006
>
09-14-2006
>
6.1. PCSR 08-14-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2009 3:26:09 PM
Creation date
3/10/2009 3:26:08 PM
Metadata
Fields
Template:
City Government
type
PCSR
date
8/14/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 6 <br />(18) Groundwater protection measures shall include: <br />a. The Operator shall file with the City an Emergency Spill <br />Prevention and Counter Control Plan and a Storm Water <br />Pollution Prevention Plan as may be required by other <br />governmental entities. The Operator shall adhere to <br />these plans in the event there is a spill. <br />b. The Operator shall provide the Fire Department with a <br />copy of their flammable or hazardous materials. <br />c. Fuel tanks shall be above ground, properly diked (if <br />required by law), and registered with MPCA. <br />d. All incidences that have the potential to adversely affect <br />groundwater, including but not limited to spills, shall be <br />verbally reported to the City within 24 hours. This verbal <br />notification shall be followed up in writing within four (4) <br />working days. <br />e. The appropriate storm water permits (NPDES) shall be <br />obtained by the Operator from MPCA and copied to the <br />City. <br />£ Stockpiles of recycled asphalt must not be placed in <br />surface water and run-off from these stockpiles shall be <br />directed away from surface waters. Further, the size of <br />the stock piles is limited to the amount of material that <br />can be used in one year, but need not necessarily be used <br />in one year and can be stored over winter. <br />g. That the hot-mix asphalt operations take place a <br />minimum of three (3) feet above the water table. Any <br />deviation to this requirement will require an amendment <br />to this permit. <br />h. The wells located at the site shall be monitored once a <br />year for diesel range organics (DRO). Mining activities <br />shall not take place closer to ground water levels than <br />indicated in the plans submitted without amending this <br />"° conditional use permit; however, if mining is proposed to <br />occur below the water table in the future, the above <br />referenced wells shall be monitored for DRO prior to <br />excavation activities commencing and after their <br />cessation each year. Further, in the event of a spill, <br />s:\planning\case files\2006\cup\cu 06-20 bauerly\gravcup-amend bauerly.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.