Laserfiche WebLink
Case File: CU 06-19 <br />Page 3 <br />Alliance Church <br />Parking and Circulation <br />Access. Users of the site will access the site from one of two drives off of 185`'' avenue. One will be <br />located along the eastern edge of the property, and the other will be located along the western edge. <br />The proposed layout provides additional easement for expansion of 185th avenue, as requested by <br />the engineering department. The City Engineer is also suggesting right of way be provided for the <br />future extension of 186' street. Staff would recommend, at minimum, provision of a written <br />easement and acknowledgement of future right-of--way needs for the extension of the future road <br />Parr The parking requirements for the church are based on the number of seats: <br />Assembly/ churches: 1 parking space per 3 seats. There are 714 seats in the main auditorium, <br />requiring 238 parking spaces. The site plan shows 238 parking spaces, including 8 handicapped <br />spaces, meeting the requirement. <br />The parking is provided generally on the north and south sides of the building, with adrive-thru <br />drop off area immediately on the west side of the building. There are several parking lot islands <br />throughout the parking lots, which all include over story trees, consistent with the development <br />regulations. <br />No detail is provided for parking lot lighting. Staff would recommend a condition be imposed that a <br />photometric plan be provided to verify that no light will spill into adjacent residential properties, <br />that the lights do not exceed 30 feet and the lights be of a shoebox design to minimize impact on <br />adjacent properties. <br />Landscaping <br />Sheet A1.2 includes the landscaping plan for the proposed church. The plan calls for the addition of <br />43 overstory trees, 21 ornamental trees, and 21 evergreen trees. The number of trees is consistent <br />with the landscaping requirements. <br />The trees are located throughout the southern half of the site, and provide additional color and <br />texture to this area of the site. The plan also provides a row of shrubbery along the south edge of <br />the south parking lot for headlight screening. <br />Staff supports the landscaping as proposed. <br />Grading, Drainage and Utilities <br />Storm water. Storm water will be distributed to the storm water pond on the north side of the north <br />parking lot via two methods. Storm water falling on the east side of the church will be collected in a <br />series of catch basins in the eastern drive and piped to the storm water pond. All other water will <br />sheet flow to the pond. The northern edge of the parking lot does not show a concrete curb. Staff <br />would recommend a concrete edge. This will define the edge of the pavement, while allowing water <br />to continue to flow over the edge without concentration. <br />S:\PLANNING\Case Files\2006\CUP\CU 06-19 Kinghorn-Alliance Church\Staff Report.doc <br />