My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1. ERMU SR02-24-2009
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2003-2013
>
2009
>
02-24-2009
>
6.1. ERMU SR02-24-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2009 3:50:47 PM
Creation date
3/9/2009 3:50:47 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
2/24/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sec. 78-33. Recovery of Costs for Shut-Offs. <br />ERMU shall recover its costs for water shut-offs. If water is shut-off from the stop-valve <br />in the street, there shall be a $600 shut-off fee which must be paid before service will be restored. <br />There will be no additional fee to restore water service if service can be restored from the stop- <br />valve. If it is necessary to excavate to search for the stop-valve, there shall be added to the $600 <br />shut-off fee an amount equal to ERMU's total costs to locate and excavate the stop-valve, <br />including appropriate charges for the use of ERMU equipment and personnel and/or all costs for <br />third party contractors. If it is necessary to enter a property to shut-off the water, there shall be <br />added to the $600 shut-off fee an amount equal to ERMU's total costs to shut-off the water, <br />including appropriate charges for the use of ERMU equipment and personnel and/or all costs for <br />third party contractors. All shut-off fees and related costs charged to a property which remain <br />unpaid for 30 days may be certified by the City Clerk to the County for collection with real estate <br />taxes. <br />Division 4. Rates and Charges <br />Sec. 78-41. Rates and Charges Generally <br />There are established in the city water availability charges, water connection charges and <br />water utility user charges and rates. Water availability charges are due and payable at the time <br />property served by the water utility is final platted into buildable lots. Water connection charges <br />are due and payable at the time of connection of a building to the water utility, or at the time <br />connection is required to be made to the water utility pursuant to Section 78-21. User charges <br />and rates are due and payable in such amounts and at such times as required by the public <br />utilities commission. Each charge and/or rate shall be in the amount established by duly adopted <br />resolution of the city council or the public utilities commission. <br />Sec. 78-42. Applicability of Charges <br />All properties connected to the city water utility shall abide by the rules and regulations <br />of the public utilities commission and shall pay all applicable water availability charges, water <br />connection charges, user charges and rates established by the city council and/or the public <br />utilities commission. Properties which are required to connect to the water utility pursuant to <br />Section 78-21, but have not connected within two years of availability of water service as <br />required by Section 78-21, shall be charged the applicable water availability charge and water <br />connection charge and a monthly user charge in an amount established by the city council or the <br />public utilities commission. <br />Sec. 78-43. Collection of Fees and Charges <br />All water service fees, and all charges and costs charged to a property pursuant to this <br />ordinance, which remain unpaid 30 days after the due date, may be certified by the City Clerk to <br />the County for collection with real estate taxes. <br />Division 5. Restrictions and Enforcement <br />
The URL can be used to link to this page
Your browser does not support the video tag.