My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.4. ERMU SR 02-24-2009
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2003-2013
>
2009
>
02-24-2009
>
5.4. ERMU SR 02-24-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2009 3:49:48 PM
Creation date
3/9/2009 3:49:48 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
2/24/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Elk River -~ <br />Municipal Utilities <br />13069 Orono Parkway • P.O. Box 430 <br />Elk River, MN 55330-0430 <br />February 24, 2009 <br />To: Elk River Municipal Utilities Commission <br />Jerry Takle <br />Jerry Gumphrey <br />John Dietz <br />From: Vance Zehringer <br />Subject: Jackson Street Water Tower <br />Phone: 763.441.2020 <br />Fax: 763.441.8099 <br />Elk River Municipal .Utilities has given the Heritage Preservation Commission until Sept <br />2009 to come up with a plan to save the Jackson Street Water Tower. Recently, more <br />activity/interest has occurred in preserving this land mazk, so we did another examination <br />of the structure and made more inquiries to more accurately assess the costs associated <br />with preserving it. <br />Attached is a lab test result performed by Corrosion Control consultants & Labs, <br />subcontractor to KLM Engineering, Inc, which shows the presence of lead based paint. <br />Initial cost estimates were 25K for touch-up painting and SOK to completely repaint the <br />structure. That cost is now estimated to be 128K because the level of lead requires sand <br />blasting to bare metal, and that means draping the tower and disposing of the paint as <br />hazazdous material.. Repainting every 20 years is required. <br />Elk River Municipal Utilities has budgeted 35K in 2009 to demolish the structure. No <br />new estimate has been made to determine if that is adequate to cover demolition now that <br />the structure is considered hazardous! <br />A power point presentation revealing the present state of the structure will be available at <br />the Commission meeting should you wish to review it. <br />
The URL can be used to link to this page
Your browser does not support the video tag.