Page 1 of 2 <br />Adams, Troy <br />From: Adams, Troy <br />Sent: Friday, January 30, 2009 9:28 AM <br />To: peter.brodd@mortenson.com <br />Cc: Zehringer, Vance <br />Subject: Proposed Data Center -Elk River, MN <br />Attachments: ERMU -Proposed Data Center -Possible Substation Sources 1-15-2009.pdf; ERMU 2009 <br />Comm rt sheet 1.pdf <br />Mr. Brodd, <br />The Elk River site on CO RD 30 near US HWY 10 and Waco Street that is being considered for the <br />proposed data center is well suited to support their utility needs. Elk River Municipal Utilities' (ERMU) <br />electric distribution system is well built and maintained with excellent reliability. This is directly reflected <br />through our 2008 IEEE reliability index numbers: SAIFI (System Average Interruption Frequency Index) <br />= 0.618, SAIDI (System Average Interruption Duration Index) = 17.31min, and CAIDI (Customer <br />Average Interruption Duration Index) = 28min. <br />Within an approximate four-mile radius of this site, ERMU has three substations suitable to serve the <br />proposed 15MW data center (refer to attached map). With minimal redistribution of load, the West <br />Substation (with a 28MVA transformer and a 22MVA transformer) and the Station 14 Substation (with <br />two 28MVA transformers) would have the capacity required to serve the requested load. The Station 14 <br />Substation would be the optimal source due to its location adjacent to Great River Energy's 30 MW RDF <br />steam plant and their new 150MW gas turbine power plant. The Waco Substation (with one 28MVA <br />transformer) is designed to expand for a second 28MVA transformer. Due to another data center currently <br />being supplied from the Waco Substation, this substation could only provide temporary power for the <br />proposed data center without adding a second transformer. The distribution voltage is 12.47kV. Currently <br />at this site, ERMU would be able to provide 2MW without infrastructure upgrades and up to SMW with <br />minimal infrastructure upgrades. <br />To provide the requested 15MWs, two new feeders would be required at the expense of ERMU. The twin <br />feeders would be separate and not parallel service entrances. To eliminate the possibility of a third party <br />having the ability to parallel two substations without utility involvement, Elk River Municipal Utilities <br />would prefer the feeders originate from one substation. Serving the facility from two feeders originating <br />from two different substations would be permitted provided the feeders served two separate service <br />entrances with lockout safeguards that would prevent the feeders from being paralleled without ERMU <br />control. These safeguards would require prior ERMU approval and would be at the expense of the data <br />center owner. The construction of the two new feeders could begin as soon as this spring. Dependant <br />upon route, configuration, and material lead times, the project could be complete within approximately 12 <br />to 18 months. The existing available 2MW to SMW would still exist as non-dedicated backup, but would <br />be subject to change as required by ERMU. <br />The data center owner would be required to pay for one-half of the metering facility costs for the project. <br />These costs are currently estimated at $70,000 but are subjected to change depending on final metering <br />arrangements proposed by the data center owner. The proposed data center would be billed according to <br />the Commercial/Industrial Rate class (refer to attached rate tariff sheet). <br />If you have any additional questions, please do not hesitate to contact me. <br />2/19/2009 <br />