Laserfiche WebLink
Alternative Generation <br />Landfill Gas Generator <br />Landfill Gas Generator <br />26.2 Million kWh in 08 <br />26.2 Million kWh in 08 <br />12% Of ER Needs <br />12% Of ER Needs <br />Performance Factor = 99% <br />Performance Factor = 99% <br />Capacity Factor = 94% <br />Capacity Factor = 94% <br />Wind Generator <br />Wind Generator <br />829 Thousand kWh in 08 <br />829 Thousand kWh in 08 <br />.37% Of ER Needs <br />.37% Of ER Needs <br />Capacity Factor = 14% <br />Capacity Factor = 14% <br />ERMU Diesel Plant <br />ERMU Diesel Plant <br />10 MW On Standby <br />10 MW On Standby <br />Ran 50 Hours In 2008 <br />Ran 50 Hours In 2008 <br />