My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.3. ERMU SR 12-11-2007
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2003-2013
>
2007
>
12-11-2007
>
5.3. ERMU SR 12-11-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2009 2:24:57 PM
Creation date
2/24/2009 2:24:57 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
12/11/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Protective devices aze required to permit safe and proper operation of the <br />Distribution System while interconnected with Customer Generator. In general, <br />an increased degree of protection is required for a larger Customer Generator due <br />to the greater magnitude of short circuit currents and the potential impact to <br />Distribution System stability. Lazger installations may require more sensitive and <br />faster protection to minimize damage and ensure safety. Customer shall provide <br />protective devices and systems to detect the Voltage, Frequency, Harmonic and <br />Flicker levels as defined in IEEE 1547 D 11 standard during periods when the <br />Customer Generator is operated in parallel with the Distribution System. <br />Section 4: Power Oualitv. Operation of Customer Generator and auxiliary <br />equipment must not cause any reduction in the quality of service provided by <br />E1ZMU to its customers nor interfere with the operation of ERMU's Distribution <br />System or ERMTJ's power supplier's transmission system. The equipment shall not <br />put any undesirable voltages, frequencies, or transients on to ERMU's Distribution <br />System or ERMU's power supplier's transmission system. If any of the <br />aforementioned events occur, the equipment shall be disconnected until such time <br />as the harmful conditions have been corrected. Customer shall be responsible <br />for taking any corrective action that may be required and/or reimbursing ERMU <br />for the cost of corrective action which ERMU deems necessary to provide and <br />restore services to prescribed limits. The Customer Generator will generate 3 phase, <br />60 hertz power when interconnected to ERMU's Distribution System at normal <br />12.47 Kv at a power factor of 98% lagging. Total Harmonic Distortion (THD) <br />levels produced by the equipment shall be less than 1 %. <br />ARTICLE 5. GENERATING EQUIPMENT OPERATION Upon not less than <br />thriy minutes notice by ERMU to Customer prior to generator start-up time, Customer <br />shall operate the Customer Generator at the output level stated in Article 1, under Customer <br />Generator during the period requested by ERMU. During such period ERMU shall not be <br />obligated to serve Customer electric load to the extent of the Customer Generator (s) <br />output. Customer shall comply with all applicable generation regulations of the Mid- <br />Continent Area Power Pool, or other regulatory body, applicable to ERMU and Customer. <br />Exceptions to the thirty minute notice may occur in system emergency situations. Every <br />attempt will be made to give as much advance notice as possible under system emergency <br />situations. <br />ARTICLE 6. COMPENSATION TU CUSTOMER. <br />Section 1: ERMIJ shall compensate Customer for the rated output of the <br />Customer Generator (times .95), or Customer's coincidental peak demand at <br />rates Indicated below: <br />Monthly Credit/Kw* <br />Summer (June, July, and Aug) $12.00 per kw <br />Winter (Dec, Jan, and Feb) $ 7.50 per kw <br />Spring/Fall (Maz, Apr, May, Sept, Oct, Nov) $ 4.00 per kw <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.