My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.4. ERMUSR 11-13-2007
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2003-2013
>
2007
>
11-13-2007
>
5.4. ERMUSR 11-13-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2009 3:49:19 PM
Creation date
2/10/2009 3:49:19 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
11/13/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Elk River Municipal Utilities <br />2008 Electric Distribution Capital Projects <br />Equipment Needs <br />$0 Replace T 12 "Frailer (14 years old) Carry Over from 2007 Delay until 2008 <br />$10,000 Replace Tires <br />$10,000 Replace ropes, slings, & chains <br />$ l 0,000 Replace fiberglass hotsticks <br />$10,000 Replace hand tools <br />$20,000 Add and replace battery operated crimpers & cutters <br />$2,000 l-land Held Radio <br />$10,000 Unknown <br />$160,000 Replace #8 bucket line truck <br />$232,000 Total <br />Normal Distribution Construction, substations & feeders <br />$500,000 Co Rd 1 new URD feeder from 209 th to 194 th Continued from last year <br />(Use cable in stock $130,000 SOOMCM, $20,000 1/0) <br />$60,000 Rebuild and upgrade feeder on Co Rd 39 in Otsego (Use cable in stock <br />$92,000 4/0) (OH $60,000, UG $220,000-$92,000=$128,000) <br />$80,000 New feeder from Station 14 bank 2 under HW 169 to Main St. Tie to <br />Purchased Connexus line (Use cable in stock X15,000 1000 MCM) <br />$90,000 Cable replace area 18 (So of Co Rd 33 & west of Hw 169) <br />$0 Rebuild and loop Cretex Plant on Hw 10 $35,000 Delay until 2009 <br />$180,000 Cable replace Brentwood area <br />$0 Cable replacement & convert to 7200 v on Simonet Dr. $70,000 Delay <br />until 2009 <br />$ 0 Complete OH line on Co Rd 40 $50,000 Completed in 2007 <br />$351,000 Purchase area 18 & payment of growth <br />$200,000 New development installation <br />$200,000 Transformers & meters <br />$37,000 Miscellaneous & unknown <br />$330,000 3 LFG Engines Major overhaul <br />$30,000 Diesel Engine Repair <br />$2,058,000 -cable in stock $ 165,000 = $1,893,000 <br />New Developments <br />River Park Jackson Av Villa's <br />Liberty Heights Wild Flower Meadows <br />
The URL can be used to link to this page
Your browser does not support the video tag.