My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ERMUSR FINANCIALS 10-09-2007
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2003-2013
>
2007
>
10-09-2007
>
ERMUSR FINANCIALS 10-09-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2009 11:24:06 AM
Creation date
2/10/2009 11:24:06 AM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
10/9/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Elk River <br />Munici~ al Utilitie s <br />13069 Orono arkway <br />Elk River, MN 55330 <br />763.441.2020 <br />Education /Seminar Report <br />Name: Troy Adams Date: October 1 2007 <br />Dates Attended: September 17-20, 2007 Location: Seattle, WA <br />Title of education /seminar: Constructing, Operating, and Maintaining Underground <br />Distribution Systems. <br />Organization Sponsoring Education /Seminar: APPA <br />Why did the employee choose to attend?: <br />ERMU General Manager Bryan Adams recommended that he and I attend this course to <br />obtain an overview of underground distribution design and learn current industry trends. <br />What information was learned by attending?: <br />This course ag ve a general introduction to underg,Lound distributions s~planning <br />design components, and reliability. Comprised of a diverse group including <br />management engineers, linemen, and a commissioner, this class provided a valuable <br />experience from the discussion of system design and other tangent utility topics. Some <br />noted topics include: XLPE vs EPR conductor, conduit vs direct buried, inspection <br />program and documentation, fault current and fuse coordination, XFMR sizing and <br />system XFMR loading analysis, The concepts learned during this course have been <br />immediately beneficial to me at ERMU. <br />Was the information conveyed to your supervisor and co-workers?: <br />The information was discussed with Bryan and Glenn Sundeen and later discussed with <br />the linemen as a group. <br />~~ ~ <br />Employee Signature• " l <br />
The URL can be used to link to this page
Your browser does not support the video tag.