My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.3. ERMUSR 10-09-2007
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2003-2013
>
2007
>
10-09-2007
>
6.3. ERMUSR 10-09-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2009 11:24:35 AM
Creation date
2/10/2009 11:22:44 AM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
10/9/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.1 Evaluation of Net Present Worth and Revenue <br />Section 3 (Assessment of Generation Capability) estimates, based on a range of capacity of generating <br />units, that the annual revenue as $0.04/Kw-hr is between $50,000 and $95,000. Operations were assumed <br />to require on average 10 hours per week for one person. Assuming 25% time and an estimated annual <br />cost of $60,000, the annual operating costs would be $15,000. Additional operating cost to run the <br />facility would be required but this may be accomplished without adding any other additional staff. <br />Adjusting the annual revenue by deducting $15,000 from the estimated revenues would result in an <br />estimated annual net revenue of $35,000 to $80,000, respectively for the upper and lower estimates. The <br />net present worth of this revenue based on a 5% annual interest rate and a 20-year period is approximately <br />$450,000 and $1,000,000, respectively. The range of net present worth of this revenue over a period of <br />40 years is $600,000 to $1,370,000, since it is not uncommon for hydropower facilities to have a lifespan <br />greater than 40 years. This assessment provides an initial estimate of the limits of the current investment <br />to break even over a 20-year period and a 40-year period, respectively. <br />P:\Mpls\23 MN171\2371089 Elk River Municipal-Orono Dam\WorkFiles\Report\Lake Orono Dam Assessment Report.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.