My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.1. PCSR 02-10-2009
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2006-2010
>
2009
>
02-10-2009
>
5.1. PCSR 02-10-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2009 1:34:43 PM
Creation date
2/9/2009 1:34:26 PM
Metadata
Fields
Template:
City Government
type
PCSR
date
2/10/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(c) Permittee shall provide an estimated development time line for the demolirion debris <br />landfill, including an estimated closure time line, which shall be updated as appropriate. <br />(d) Permittee shall pay the demolition debris surcharge authorized by Minn. Stat. ~ <br />115A.921, Subd. 2. The Surcharge shall be paid directly to the City on a monthly basis, <br />and shall be accompanied by an accurate report on the amount and type of demolition <br />debris disposed of each day during the month. The Surcharge due for each month <br />shall be received by the City no later than the thirtieth calendar day of the succeeding <br />month. Failure to pay the surcharge fee when due shall be cause for revocation of this. <br />Permit and shall be a violation of the conditions and requirements of this Permit for <br />the purposes of the related operations authorized by Section 2 of this Permit. <br />(e) That Permittee is in strict compliance with all other terms, conditions and <br />requirements of this Conditional Use Permit, including specifically, but not limited to, <br />the operational and environmental monitoring requirements of sections 4, 6, and 7; <br />and the requirements of sections 17 and 25 to make prompt payment of all fees due to <br />the City. No demolition debris may be accepted at the demolition debris landfill if this <br />condition is not complied with. Permittee must immediately stop accepting demolition <br />debris upon written notice from the City that there is a violation of this condition. <br />(04) Other Related Operations. No other operations or activities, whether or not related to the <br />Landfill, shall be permitted or allowed on the Landfill Property unless this Permit is first amended to <br />specifically allow such operations and to specify the applicable conditions, except mining activities or <br />other operations licensed or permitted separately by City. <br />3.) Buffer Zone/Screening: A Buffer Zone shall be established within the perimeter of the <br />Landfill Property around the waste disposal areas of not less than 200 feet, except on the north side. <br />Within this Buffer Zone, no waste disposal may occur. The Landfill shall develop an inventory of <br />significant trees within the buffer zone. The preservation of trees within the buffer zone shall be <br />included in plans for construction, operation, and closure of the Landfill. Said plans shall be in <br />compliance with the screening plans dated, May 28, 1999 and ,which are incorporated into Sherburne <br />County's license for the Landfill. <br />4.) Specific Additional Operational Requirements. <br />(01) Leachate Transmission Pipes. Permittee shall verify to the City every four (4) years that the <br />existing Leachate transmission pipes for cell 6 and other related lined areas do not leak. <br />(02) Backup Leachate Pumps. Permittee shall maintain backup a pumps for use in the event of <br />pump failure at the Leachate sump, wet well and Leachate storage tank on-site. As an alternative, the <br />permittee shall maintain provisions for restoring temporary Leachate pumping within a 24-hour period <br />and adhere to the current "Leachate Management Plan" as approved by MPCA. <br />(03) Leachate Holding Tank. Permittee shall ensure that the Leachate-holding tank is pumped out <br />on a regular schedule. It shall be a violation of this Permit to allow Leachate to collect on the liner to a <br />depth exceeding one foot due to the Leachate-holding tank being full. <br />C:\Documents and Settings\jvassar\Local Settings\Temporary Internet Files\OLK7B\LANDCUP.DOC Page 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.