Laserfiche WebLink
07/01/96 13:41 ~002 <br /> <br />Cost Est~m ate Plan D <br /> <br /> Phase 1 (4 Fields) <br /> <br />Parldng Lot CL-5 <br />Dz/veway 24' x 600' <br />Well and pump <br />Irrigation <br />Backstops 4 each @ 4,000 <br />Baseline Fences 10' x 120' w/T.T.C. Rail ~ 13.50/If. <br />Outfield Fences 8' w/Top Raft @ 11.00/lf. <br />Gates <br />Ag Lime <br /> <br />Seed smd FerMH~.er <br />I0% ConMn gency <br />Sales Tax <br /> <br />160 C2rs 125' x 450" 1875T <br /> 48O T. @ <br /> <br />2 each @ 500.00 <br />600 T/field Mater/al only 6.50/T. <br /> Del/very 6.00/T. <br /> <br />$ 41,500 <br />13,125 <br />3,360 <br />9,000 <br />22,500 <br />16,000 <br />13,000 <br />22,000 <br />1,000 <br />13,000 <br />12,000 <br />7,O0O <br />17,000 <br />6,000 <br />$196,485 <br /> <br />Phase II (2 Fields) <br /> <br />Grading <br />Road and paring Lot <br /> <br />CL-5 (80 Cars) 125 X 225' <br /> 1000T @ $7.00 <br /> <br />Irr/gation <br />Backstops 2 each ~ 4,000 <br />Baseline Fences 10' x 120' W/T & B Rail 13.00/If. <br />Outfield Fences <br />Gate 1 each @ 500.00 <br />Ag Lime 500 T/field Mater/al 6.50/T <br />Seed and FerMl~-.er <br />1'0% ConM~gency <br />Sales Tax <br /> <br />33,500 <br /> <br />7,000 <br />12,500 <br />8,000 <br />6,500 <br />12,000 <br />500 <br />'6,500 <br />3,500 <br />9,000 <br />$,ooo <br />$108,000 <br /> <br />s:\oSs~t~\cos~st.doc <br /> <br /> <br />