My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.3. ERMUSR 05-13-2008
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2003-2013
>
2008
>
05-13-2008
>
5.3. ERMUSR 05-13-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2009 2:38:08 PM
Creation date
1/30/2009 2:38:03 PM
Metadata
Fields
Template:
City Government
type
ERMUAG
date
5/13/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TRANSMISSION FACILITIES ASSIGNMENT AGREEMENT <br />This Assignment Agreement ("Agreement") shall confirm the agreement reached on April ~~ ~, 2008, by and between the <br />Central Minnesota Municipal Power Agency ("CMMPA") acting for itself, its members, the Midwest Municipal <br />Transmission Group and its members and the City of Elk River ("City"). Hereinafter, CMMPA and City are sometimes <br />referred to singly as "Party" and collectively as "Parties", with respect to the intent to assign operational control of qualifying <br />transmission facilities under the terms and conditions as follows: <br />Assignee: <br />Assignor: <br />Governing <br />Agreements: <br />Contract Term <br />CMMPA <br />City C~= L. \L ~ • ~,,~ ~. 1.141 1 C. ~ ~ a` ~J ~Y' 1 fir„ t `C ~ ~~ . <br />The Midwest Independent Transmission System Operator ("MISO") Transmission and Energy <br />Markets Tariff ("TEMT"), effective March 1, 2005; Transmission Owner (TO) Agreement <br />between CMMPA and MISO <br />January 1, 2008 through December 31, 2013. <br />Transmission Facilities: All of City's transmission facilities regardless of voltage as more fully set forth on attachment <br /><<A,> <br />Assignment: City does hereby transfer operational control of its transmission facilities to CMMPA during the <br />term of this agreement and any renewal terms. The City shall retain physical control of its <br />transmission facilities along with the obligations to repair, maintain and insure these facilities in <br />accordance with good utility practices. CMMPA has no liability for, and by execution of this <br />agreement assumes no liability for, City's transmission facilities. <br />Reassignment: City acknowledges that CMMPA will fully reassign and convey operational control of qualifying <br />transmission facilities to MISO in accordance with MISO requirements and Federal Energy <br />Regulatory Commission (FERC) law and policy. <br />NERC Compliance <br />Responsibility City retains all responsibilities to comply with the North American Electric Reliability Corporation <br />(NERC) rules and regulations. If City wishes to assign NERC compliance responsibility to <br />CMMPA, it must do so in a separate agreement. <br />Designated Market <br />Participant <br />Transmission <br />Scheduling: CMMPA shall use Utilities Plus ("UP") as its designated MISO Market Participant ("MP") to <br />schedule transactions as defined in the TEMT and in accordance with all MISO rules and <br />regulations. <br />Designated MISO <br />Transmission Owner (TO) <br />Collection of <br />Revenues: City hereby appoints CMMPA as its MISO TO agent for all purposes required under the TO <br />Agreement and TEMT including but not limited to the submittal and collection of all Annual <br />Transmission Revenue Rights payments under the TEMT and protesting or contesting, on its <br />behalf, any errors in billing or related matters. On its behalf, City authorizes CMMPA to obtain <br />rate recovery and revenue distribution from MISO and other TOs as necessary. <br />Disbursement of <br />Revenues Received: CMMPA shall, after collecting reasonable fees and costs for its services and those of UP and <br />subject to any other relevant agreements with the City, disburse the revenues received from MISO <br />and other TOs for the use of City's transmission facilities to the City in an equitable manner. <br />
The URL can be used to link to this page
Your browser does not support the video tag.