Laserfiche WebLink
2. The Utility will buy electricity from the QF under the current rate schedule for the <br />class of customer to which the QF belongs with the Commission. The QF has elected the <br />rate schedule category hereinafter indicated (select one): <br />a. Net energy billing rate. <br />b. Simultaneous purchase and sale billing rate. <br />c. Time-of--day purchase rates. <br />A copy of the current rate schedule is attached to this contract. <br />3. The rates for sales and purchases of electricity may change over the time this contract <br />is in force, due to actions of the Utility and the QF and the Utility agree that sales and <br />purchases will be made under the rates in effect each month during the time this contract <br />is in force. <br />4. The Utility will compute the charges and payments for purchases and sales for each <br />billing period. Any net credit to the QF will be made under one of the following options <br />as chosen by the QF: <br />1. Credit to the QF's account with the Utility. <br />2. Paid by check to the QF within 15 days of the billing date. <br />5. The QF must operate its electric generating facilities within any rules, regulations, and <br />policies adopted by the Utility on Cogeneration and Small Power Production which <br />provide reasonable technical connection and operating specifications for the QF. <br />6. The QF will operate its electric generating facilities so that they conform to the <br />national, state, and local electric and safety codes, and will be responsible for the costs of <br />conformance. Particular attention shall be given where voltage on the utility side of the <br />meter drops below nominal voltage, QF equipment shall automatically disconnect from <br />utility. <br />7. The QF is responsible for the actual, reasonable costs of interconnection including any <br />special metering which are estimated to be $ .The QF will pay the Utility <br />in this way: <br />8. The QF will give the Utility reasonable access to its property and electric generating <br />facilities if the configuration of those facilities does not permit disconnection or testing <br />from the Utility's side of the interconnection. If the Utility enters the QF's property, the <br />Utility will remain responsible for its personnel. <br />9. The Utility may stop providing electricity to the QF during a system emergency. The <br />Utility will not discriminate against the QF when it stops providing electricity or when it <br />resumes providing electricity. <br />