My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.6. ERMUSR 04-17-2008
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2003-2013
>
2008
>
04-17-2008
>
6.6. ERMUSR 04-17-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2009 1:32:24 PM
Creation date
1/30/2009 1:32:18 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
4/17/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~j <br />Elk River <br />Municipal Utilities <br />13069 Orono Parkway • P.O. Box 430 <br />Elk River, MN 55330-0430 <br />April 7, 2008 <br />To: Elk River Municipal Utilities Commission <br />Jerry Takle <br />John Dietz <br />Jerry Gumphrey <br />From: Bryan Adams <br />Subject: Cogeneration Agreement <br />Phone: 763.441.2020 <br />Fax: 763.441.8099 <br />We have a couple of small electric generators on our system that operate intermittently. As the <br />renewable energy fad becomes more popular with other technologies, we will see more of the <br />smaller electric generators on our system. The Public Utilities Commission (PUC) has <br />developed a uniform statewide contract for small cogeneration projects less than. 40KW that <br />utilizes net metering. Although the Elk River Municipal Utilities does not fall under the PUC <br />guidelines, we should have a contract f`or such applications. <br />The attached contract is the PUC contract with minor corrections including Elk River Municipal <br />Utilities Commission substituted for Public Utilities Commission. Staff recommends adoption of <br />this blanket agreement. <br />
The URL can be used to link to this page
Your browser does not support the video tag.