My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ERMUSR MISC MEMO 02-12-2008
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2003-2013
>
2008
>
02-12-2008
>
ERMUSR MISC MEMO 02-12-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2009 12:59:44 PM
Creation date
1/30/2009 12:21:53 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
2/12/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~/ <br />Elk River <br />Municipal Utilities <br />13069 Orono Parkway • P.O. Box 430 <br />Elk River, MN 55330-0430 <br />February 6, 2008 <br />To: Elk River Municipal Utilities Commission <br />Jerry Takle <br />Jerry Gumphrey <br />Jim Tralle <br />From: Bryan Adams <br />Subject: Miscellaneous Issues <br />Phone: 763.441.2020 <br />Fax: 763.441.8099 <br />Enclosed is the packet for the Tuesday, February 12, 2008, commission meeting at 4:00 p.tn. <br />January 2008 water and electric usage is well above last year of 7.68% and 11.92% respectively. <br />There are no graphs in the financials this month because the graphs will only show one point fur <br />2008 and would be difficult to interpret. <br />Three of the engines at the landfill are due for their five year major overhaul. In January these <br />engines were replaced with rebuilt engines. It took about a day to disconnect, remove, reinstall, <br />and connect each engine. <br />The construction of Well #9 is in the development stages and will hopefully be completed in the <br />next couple of weeks. The construction of the small water treatment building is scheduled to <br />start in late February. <br />Maintenance of Well #, 7 is complete and should be operational next week. <br />We received 59 applications for our part-time accountant position, with 9 very good candidates. <br />We are starting the interviewing process. <br />Enclosed are the following articles for your review: <br />
The URL can be used to link to this page
Your browser does not support the video tag.