My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.13. SR 06-17-1996
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1996
>
06/17/1996
>
5.13. SR 06-17-1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:32:21 AM
Creation date
4/4/2003 8:15:18 PM
Metadata
Fields
Template:
City Government
type
SR
date
6/17/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONSULTINGENGINEERS <br /> <br />1326 Energy Park Drive <br /> <br />St. Paul, MN 5,.5108 <br /> <br />612-644-4389 <br /> <br />1-800-888-2923 <br /> <br />Fax: 612-644-9446 <br /> <br />CIVIL ENGINEERING: <br />ENVIRONMENTAL <br />MUNICIPAL <br />PLANNING <br /> <br />SOLID WASTE <br />STRUCTURAL <br />SURVEYING <br />TRAFF}C <br />TRANSPORTATION <br /> <br />ELECTRICAL/MECHANICAL <br />ENGINEERING: <br /> <br />HVAC <br /> <br />POWER DISTRIBUTION <br /> <br />SCADA <br /> <br />SYSTEM CONTROLS <br /> <br />OFFICES IN: <br /> <br />MINNEAPOLIS <br /> <br />PRIOR LAKE <br /> <br />ST. PAUL <br /> <br />WASECA <br /> <br />ITEM 5.13. <br /> <br />June 12, 1996 <br />File: 230-235-80 <br /> <br />Honorable Mayor and City Council <br />City of Elk River <br />13065 Orono Parkway <br />P.O. Box 490 <br />Elk River, MN 55330 <br /> <br />RE: TRUNK HIGHWAY 10/MAIN STREET INTERSECTION <br /> <br />Dear Council Members: <br /> <br />As you may be aware, several years ago, we were asked to look at alternatives for <br />improving the intersection of Main Street and Trunk Highway 10. Several options were <br />prepared and presented to the City Council. Based on these concepts an ISTEA <br />application was prepared and submitted. We were successful in getting our project <br />programmed for FY 1996. We had estimated the cost of the project at $500,000 with <br />$400,000 being Federally funded. This does not include the land acquisition issues, which <br />obviously on this project would be substantial. Last year, we made a request to have this <br />project moved from FY 1996 to FY 1997 in the ISTEA program. <br /> <br />At the recently completed MnDOT tour this was one of the projects we discussed. Much <br />of the discussion centered around whether or not there would be enough benefit gained <br />from this type of improvement to commit much of the City's financial resources for the <br />necessary land acquisition and construction cost. If in fact, the City Council feels that the <br />City is not in a position to proceed with this project at this time, we should let MnDOT <br />know officially and have it dropped from the program, so other projects within District <br />3 can be moved up to take our place. <br /> <br />If you have questions regarding this, I will be in attendance at your June 17, 1996, City <br />Council meeting. <br /> <br />Sincerely, <br /> <br />MSA, CONSULTING ENGINEERS <br />Te~dSp. E.~~ <br /> <br />TJM:pd <br /> <br />000-1202 .jun <br /> <br />An Equal Opportunity Employer <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.