Laserfiche WebLink
Page 3 of 5 <br />> Specific use of funds, if not listed in description: <br />> Paver bricks for the perimeter (approx. 15 x 20) _ $100 <br />> Stepping stones for the center = $30 <br />> Soil test and amendments needed = $50 <br />> Plants = $250 <br />> Butterfly house = $20 <br />> Mulch = $150 <br />> Money for aspeaker = $50 <br />> Timeline of project: <br />> Summer-fall of 2007 or spring of 2008 <br />> Prepare garden area, remove weeds or sod <br />> Soil test/amend if needed <br />> Add pavers and stepping stones <br />> Some plants added (contact local nurseries and Master Gardeners for <br />> donations also) <br />> Mulch <br />> Winter 2008 <br />> Prepare the display <br />> Incorporate related speaker into the garden expo plans and meetings <br />> Plan appropriate teaching activities for the kid's garden club at the <br />> expo (i.e. the life cycle of a butterfly, or the bee colony and honey <br />> production) <br />> Spring 2008 <br />> Utilize the display at spring garden expos in the county <br />> Conduct the above educational activities <br />> Complete the planting of the garden and schedule maintenance <br />> activities with Master Gardener volunteer time <br />8/9/2007 <br />