My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5. - 12. ICESR Laserfiche: '2. ICE AGENDA 04-05-2005
ElkRiver
>
City Government
>
Boards and Commissions
>
Arena Commission
>
ICE Packets
>
2000-2009
>
2005
>
04-05-2005
>
5. - 12. ICESR Laserfiche: '2. ICE AGENDA 04-05-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2009 10:03:04 AM
Creation date
1/16/2009 10:00:10 AM
Metadata
Fields
Template:
City Government
type
ICESR
date
4/5/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Hockey have moved on and new board members take their place, it gets harder each year <br />to explain the details of the agreements that were made almost a decade ago. I believe it <br />is time that these agreements are signed or new agreements are re-negotiated so that there <br />is some understanding for everyone involved. Attached for review are the three <br />agreements that were originally established. <br />11. Staff Updates <br />A. Shooting Area <br />The shooting Area in the Barn was completed last fall; the area was very popular <br />throughout the season. We did not charge for this area and do not plan on charging a fee <br />next year. <br />B. Arena Projects <br />This year we have added a water softener that provides soft water throughout the <br />building. It has already made a big difference in the condition of the ice. The ice sets up <br />faster and has a clarity that it never had before. The scale that once built up on the <br />Arenas equipment is no longer there, resulting in a newer looking Zamboni. This <br />summer the cooling towers chemical treatment plan will be looked at to see if we can cut <br />back on the chemicals we are using to treat the towers. We will also be experimenting on <br />using lower temperature water when resurfacing the ice. By using cooler water to <br />resurface the ice, we will not only save on our gas bill but should save on electricity as <br />well. <br />Besides the usual cleaning, we will be painting the areas of the rink that are in need of <br />being painted, install rubber matting to the areas that need to be replaced, install outlets <br />over the rink for dry floor events, and put up a couple of sections of center groove in the <br />Barn. <br />C. Dryfloor <br />The following the dryfloor schedule for this summer: <br />The Jose Cole Circus; April 13tH <br />The Spring Craft Fair; May 7th and 8th <br />Summer Youth Dance: May 20th <br />Fall Dance: September 9th <br />Fall Craft Show: September 17th and 18th <br />
The URL can be used to link to this page
Your browser does not support the video tag.