My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6. - 12. ICESR 04-13-2004
ElkRiver
>
City Government
>
Boards and Commissions
>
Arena Commission
>
ICE Packets
>
2000-2009
>
2004
>
04-13-2004
>
6. - 12. ICESR 04-13-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2009 9:28:47 AM
Creation date
1/16/2009 9:28:46 AM
Metadata
Fields
Template:
City Government
type
ICESR
date
4/13/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Until this person is hired and some history is developed, it will be hard to predict what <br />affect this will have on the operations of the Arena. The Arena Commission will keep in <br />tact for now, however whether the Parks and Recreation Director will have the Arena <br />Commission report to the City Council or report to the Parks Commission is up in the air. <br />11. Shooting Area <br />The Bleachers on the south end of the Barn have been removed for a few years. Initially <br />my thought was that this area would be a great place for a meeting room and offices. <br />However, the Arena's needs and budget would not have permitted this until the far future. <br />This area has been wide open were it has become a prime area for kids to gather for a <br />pick up game of floor hockey or tag. Pucks and balls some times fall along the main <br />hallway and the area is not very safe due to the low railing looking over the rink. <br />There was some discussion that Elk River Youth Hockey may use this area for a shooting <br />area. Other Arena customers have approached me to use this area for uses such as <br />stretching and other dry floor activities. <br />For scheduling purposes I feel that this area could be better served by the Arena's <br />customers if the Arena schedules this area. We have installed a cyclone fence and will be <br />installing shooting panels that can be removed so that this area could be used for other <br />activities. A few sections of the used Barn boards and plexie glass will be used to secure <br />this area as well as make it a safer place to use pucks. Customers can either pay a yearly <br />fee or on a per time basis. The fees have yet to be determined. <br />12. Staff Update <br />A. Arena Advertisement <br />North Memorial did not renew their advertisement on the Zamboni. We have been using <br />this space to advertise our own programs until another advertiser can be found. Other <br />advertisers we have lost are Ace Hardware (they are looking at selling the business) and <br />Elk River Ford. Anew advertiser is AMCAP Mortgage. <br />B. Summer Projects <br />Besides the construction of the Barn's floor and boards there are a few more projects that <br />we will be working on this summer. <br />May 17tH we will be taking the ice out of the Olympic rink to level the sand. We will be <br />making some minor repairs to the boards as well as general maintenance to other parts of <br />the Olympic rink. Besides these repairs the new condenser will be installed at this time <br />as well as the backpressure regulator. All this work has to be completed by June 1St so <br />that we can have ice ready to go by June 6tH <br />Other items that we will be working on are: <br />
The URL can be used to link to this page
Your browser does not support the video tag.