My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5. ECCSR 11-16-2005
ElkRiver
>
City Government
>
Boards and Commissions
>
Energy City Commission
>
ECC Packets
>
2005-2009
>
2005
>
11-16-2005
>
5. ECCSR 11-16-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2009 3:55:39 PM
Creation date
1/15/2009 3:54:59 PM
Metadata
Fields
Template:
City Government
type
ECCSR
date
11/16/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Kiver <br />MEMORANDUM <br />TO: Energy City Commission <br />FROM: Rebecca Haug, Environmental Administrator <br />DATE: November I6, 2005 <br />SUBJECT: Staff Comments for Energy City Website Consultants <br />Attached in your packet is a memo from Heidi Steinmetz, Asst. Director of Economic <br />Development regarding the Energy City website redesign. Heidi contacted three web <br />site designers and was asked to answer some questions. The questions the designers <br />asked are listed on the memo from Heidi. <br />Staff and Vance decided to go through the questions and give their opinion. The <br />following is what our thoughts are for the website in the order they are asked on the <br />memo from Heidi: <br />• We like that there is a website but we don't like the lack of information and <br />images throughout the website. We also think the colors need to be changed. <br />• The existing content should be re-thought, edited and new information should <br />be added. <br />• The intent is to have visitors return to the site monthly. <br />• The target audience should be energy-related businesses and the public. <br />• The target audience will want to find out information on how to set-up a tour; <br />what type of incentives the city can provide a business if they locate here <br />(possibly a link to the EDA website). <br />• The stakeholders of the site are the ECC and residents of Elk River. <br />• The ECC and staff will be looking at the results and be accountable. <br />• The ECC and EDA should be willing to invest in building a successful site. <br />
The URL can be used to link to this page
Your browser does not support the video tag.