My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.3. ERMUSR 01-13-2009
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2003-2013
>
2009
>
01-13-2009
>
6.3. ERMUSR 01-13-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2009 3:47:54 PM
Creation date
1/13/2009 3:47:54 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
1/13/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2008 Electric Outage Report <br />Page 3 of 3 <br />Another statistic staff gets concerned about is the average length of any outage. <br />ERMU's 2008 average length of outage is 99.3 minutes. Last year the average length <br />of outage was 68.8 minutes. Electric utilities with a high percentage of underground <br />facilities will exhibit higher length of outage time than electric utilities with more <br />overhead facilities. <br />Staff has reviewed these statistics in detail to find ways to improve. These statistics are <br />very good compared to other utilities. While other utility stats are difficult to obtain, <br />these are some typical numbers we have found: <br />MN Power Ottertail Xcel Connexus (2003 ERMU <br />SAIDI 143 min 115 to 70 min 153 to 99 min 45 min 17.3 min <br />SAIFI 1.2 2.1 to 1.25 1.36 to .96 .56 .618 <br />CAIDI 120 min 59 to 55 min 112 to 99 min 80 min 28 min <br />
The URL can be used to link to this page
Your browser does not support the video tag.