My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.2. SR 01-12-2009
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2009
>
01-12-2009
>
5.2. SR 01-12-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2009 9:09:30 AM
Creation date
1/9/2009 9:07:27 AM
Metadata
Fields
Template:
City Government
type
SR
date
1/12/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City Council Muiutes <br />August 20, 2007 <br />Page 3 <br />------------------------- <br />6.1. R uest b Ci of Elk River for Ordin ce Amendm nt R din Si son Pu is <br />Pro e Case No. OA 07- 9-Public Hearin to be Re-noti ed for Future Date <br />Mr. Barnhart requested to postpone this item. but noted it was advertised for a public <br />hearing. <br />Mayor HIinzing opened the public hearing- There being no one to speak to this issue, Mayor <br />Klinzing closed the public hearing. <br />MOVED BY COUNCILMEMBER GUMPHREY AND SECONDED BY <br />COUNCILMEMBER FARBER TO CONTINUE THIS ITEM AND REPUBLISH <br />THE PUBLIC HEARING NOTICE WREN IT IS READY FOR <br />CONSIDERATION. MOTION CARRIED 5-0. <br />r~. 6.2. Confirm the Direction of the Redevelotiment Framework Plan (Mississippi Connections <br />Task Force ReQardin~ I Ii~ha'ay 10 <br />Mr. Leeseberg presented the staff report. <br />Mayor Klinzing questioned if the proposed cut and cover design for Highway 10 would <br />have a cover over it. She thought it would be similar to 35W in Duluth and would allow <br />green space over the top. <br />Mr. Maurer stated it may not have a cover if it is not needed functionally and Mn/DOT <br />would make this deterinination. <br />Councilmember Moon expressed concerns with having the Taskforce continue this Plan <br />(Mississippi Connections) when a large part of the puzzle (the final design for Highway 10) <br />is incomplete. He stated he would like the proposed alignment for Highway 10 finalized <br />before moving forward. He stated he would like to suspend the Taskforce until a Geomemc <br />Study (Study) could be completed. <br />Mayor Klinzing stated the Plan is long term so it would make sense to wait until a Study <br />was completed. She noted that the Taskforce did an excellent job on this plan. <br />Councilmeinber Moon questioned what the Council would like to see if a developer wants <br />to build along the highway prior to a final plan being completed. <br />Councilmember Gumphrey stated the Taskforce did an outstanding job with the Plan and <br />he doesn't want to stop their progress. <br />Councilmember Zerwas stated the city would be putting property owners in a difficult <br />position if there are too many plans in place. He questioned the timeframe for the Study. <br />Mr. Maurer stated the Study might possibly be incorporated into the 169 Study with the <br />understanding that the city would pay for it. He would need to get confirmation from <br />Mn/DOT. He stated it could be six to nine months before completed to the alternative <br />selection stage. <br />Councilmeinber Gumphrey questioned the cost of the Study. <br />
The URL can be used to link to this page
Your browser does not support the video tag.