My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2.1. SR 05-23-1996
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1996
>
05/23/1996 - SPECIAL
>
2.1. SR 05-23-1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:32:19 AM
Creation date
3/13/2003 7:43:32 PM
Metadata
Fields
Template:
City Government
type
SR
date
5/23/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Creative Soiui~onx for Land Planmng and D¢.~gn "':' <br /> <br />April 17, 1996 <br /> <br />Mr. Patrick Klaers, City Administrator <br />City of Elk River <br />P.O. Box 490 <br />13065 Orono Parkway <br />Elk River, Minnesota 55330-1743 <br /> <br />RE: Riverfront Pathway <br /> <br />Hoisington Koegler Group Inc. <br /> <br />Dear Mr. Klaers: <br /> <br /> As we discussed at the last meeting of the Elk River I-IRA, we need to complete the schematic <br /> design and develop refined cost estimates in order for the City to determine the most appropriate <br /> way to proceed with the Riverfront Pathway project. That work is nearing completion, and a <br /> meeting with the lIRA and Riverfmnt Pathway committee would be in order. <br /> <br />Because of other events that may preclude my presence at a meeting in late April or early May, I <br />would like to schedule such a meeting in the rrdddle of May (May 15 or May 22). We can provide <br />the HRA with information prior to that meeting ff desired. <br /> <br />At the meeting, I would like to have the HRA and Riverfront Pathway committee review the entire <br />design. The last time the project was presented to the HRA and the City Council, we learned a <br />great deal, and the continued input of these groups will only benefit the project. We would also <br />review the cost estimates, which would be broken into the following categories: <br /> <br /> Area 'A' The area along the river which falls between Jac'kson Street and King Street <br /> Area 'B' The "hole," or the area directly across Jackson Street from Main Street to the river <br /> Area 'C' The area along the river east of Jackson Street <br /> <br />Area 'B' would be divided into two parts to provide flexibility in identifying a project that could <br />begin in 1996 or 1997. <br /> <br />This information should allow the HRA to determine a course of action that suits the community's <br />ability to implement an acceptable design. <br /> <br />Please call me if you have any questions. <br /> <br />Sincerely, <br /> <br />Michael Schroeder <br /> <br />7300 Metro Boulevard, Suite 525, Minneapolis, Minnesota 55439 <br />(612) 835-9960 Fax (612) 835-3160 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.