My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.3. PCSR 08-12-2008
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2006-2010
>
2008
>
08-12-2008
>
5.3. PCSR 08-12-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/16/2008 2:22:24 PM
Creation date
12/16/2008 2:22:24 PM
Metadata
Fields
Template:
City Government
type
PCSR
date
8/12/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sheet2 <br />Chart #1 <br />Elk River Municipal Utilities Peak Day Pumpage <br />25000 <br />~ 20000 <br />0 <br />°0 15000 <br />c <br />~ 10000 <br />ca <br />a <br />~ 5000 <br />a <br />Current DNR Maximum <br />Daily Pumping Leve Maximum <br />WeII Capacity <br />Minimum ' <br />.,..,...__~'°'"-'-° _._ Probable <br />0 <br /> <br /> <br /> Year <br />This graph reflects the peak day system usages the water production facilities must satisfy. Growth of the peak <br />day demand dictates when additional water wells, filter plants,and water towers must be added to the system. <br />Pumpage projections in the above graph are a function of both weather and growth. <br /> Elk River Municipal Utilities Annual Water Production <br /> 3000 <br /> <br /> 2500 <br /> <br /> 2000 Maximum <br /> <br /> <br />.,.. <br />~ <br />1500 <br />c Current DNR Annual Withdr <br />- <br />= <br />1000 Limit is 1,600,000,000. Gal. Minimum <br /> <br /> __. Probable <br /> 500 <br /> <br /> 0 <br /> <br /> <br /> ,~~ ~°~ ,~0 ,~0 ,~~ ~O ~O ~O ~O ~O ~O ~O ~O ~O <br /> Year <br />ElecWaterProj1 Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.