Laserfiche WebLink
Show elevations for the sanitary sewer services to the buildings. It appears there <br />is a crossing conflict with the proposed watermain. <br />Record drawing plans and GIS data will be required on all utilities (private and <br />public) after completion of the construction. Specific information relative to the <br />format can be provided by the Engineering Division. <br />C. Storm Water Calculations <br />• Provide calculations showing the amount of dead storage required and provided <br />in the pond. <br />• Use a Cn of 99 for area of pond up to the 100-year HWL. <br />D. Preliminary Plat <br />• Provide drainage easement for pond <br />• Provide utility easement for sanitary sewer and watermain over Lots 1 and 2. <br />• Provide drainage easement over all of Oudot A <br />• Graphically show easement for Zane Street <br />If you have any questions regarding any of these comments, please contact me. <br />S:\PLANNING MAIN\Case Files\Plat\P 08-08 Zane Street Commons\07 30 OS engrs comments.doc <br />