My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.1. PCSR 08-12-2008
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2006-2010
>
2008
>
08-12-2008
>
5.1. PCSR 08-12-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/16/2008 2:20:21 PM
Creation date
12/16/2008 2:20:21 PM
Metadata
Fields
Template:
City Government
type
PCSR
date
8/12/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Show elevations for the sanitary sewer services to the buildings. It appears there <br />is a crossing conflict with the proposed watermain. <br />Record drawing plans and GIS data will be required on all utilities (private and <br />public) after completion of the construction. Specific information relative to the <br />format can be provided by the Engineering Division. <br />C. Storm Water Calculations <br />• Provide calculations showing the amount of dead storage required and provided <br />in the pond. <br />• Use a Cn of 99 for area of pond up to the 100-year HWL. <br />D. Preliminary Plat <br />• Provide drainage easement for pond <br />• Provide utility easement for sanitary sewer and watermain over Lots 1 and 2. <br />• Provide drainage easement over all of Oudot A <br />• Graphically show easement for Zane Street <br />If you have any questions regarding any of these comments, please contact me. <br />S:\PLANNING MAIN\Case Files\Plat\P 08-08 Zane Street Commons\07 30 OS engrs comments.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.