My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.11. SR 05-20-1996
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1996
>
05/20/1996
>
5.11. SR 05-20-1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:32:19 AM
Creation date
3/13/2003 7:29:54 PM
Metadata
Fields
Template:
City Government
type
SR
date
5/20/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~ONSULTING ENGINEERS <br /> <br />1326 Energy Park Drive <br /> <br />St. Paul, MN 55108 <br /> <br />612-644-4389 <br /> <br />1-800-888-2923 <br /> <br />Fax: 612-644-9446 <br /> <br />CIVIL ENGINEERING <br />ENVIRONMENTAL <br />MUNICIPAL <br />P~NNING <br /> <br />SOLB WASTE <br />STRUCTURAL <br />SURVEYING <br />TRAFFIC <br />TRANSPORTATION <br /> <br />ELECTRiCAL/MECHANiCAL <br />ENG!NEERiN© <br /> <br />HVAC <br /> <br />POWER DISTRIBUTION <br /> <br />SCADA <br /> <br />SYSTEM CONTROLS <br /> <br />OFFICES IN: <br /> <br />MINNEAPOLIS <br /> <br />PRIOR LAKE <br /> <br />ST. PAUL <br /> <br />WASECA <br /> <br />ITEM 5.11. <br /> <br />May 10, 1996 <br />File: 230-000-00 <br /> <br />Mr. Pat Klaers <br />City Administrator <br />City of Elk River <br />13065 Orono Parkway <br />P.O. Box 490 <br />Elk River, MN 55330 <br /> <br />RE: TRUNK HIGHWAY 10 TRAFFIC CONTROL INTERCONNECTION <br /> <br />Dear Mr. Klaers: <br /> <br />As I informed the City Council at a meeting last month, MnDOT is planning a traffic <br />control interconnect project on TH 10. This project will connect the signals at Main <br />Street, Jackson Avenue, and Proctor Avenue. This should greatly improve the flow of <br />traffic on TH 10 through the City. I did not know at that time that MnDOT would be <br />looking for City cost participation. They have submitted the plans to me at this point for <br />City approval, and have indicated that the project will be 80% federally funded and the <br />remaining 20% will be equally split between MnDOT legs, City legs, and the one County <br />leg. They estimate that the City's share would be approximately $7,000. <br /> <br />As we discussed earlier with Lori Johnson, this expenditure would be MSA fundable; <br />however, with this small of an amount, I would recommend some other funding source if <br />available, to eliminate the need for MSA paperwork. Certainly we have enough projects <br />in the City to use our MSA funds on that we do not have to worry about pulling money <br />out for these small projects if other funds are available. <br /> <br />I would recormnend that the City Council approve the plans and authorize me to sign them <br />on the City's behalf. <br /> <br />If you have any questions regarding this issue, please call. <br /> <br />Sincerely, <br /> <br />MSA, CONSULTING ENGINEERS <br /> <br />Terry J. g, faurer, P.E. <br /> <br />TJM:tw <br />000-1010.may <br /> <br />An Equal Opportunity Employer <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.