My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.6. ERMUSR 07-15-2008
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2003-2013
>
2008
>
07-15-2008
>
5.6. ERMUSR 07-15-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2008 1:08:11 PM
Creation date
12/15/2008 1:08:11 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
7/15/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ji <br />Elk River <br />Municipal Utilities <br />13069 Orono Parkway • P.O. Box 430 <br />Elk River, MN 55330-0430 <br />June 16, 2008 <br />To: Lori Johnson, City Administrator <br />From: Bryan Adams, Elk River Municipal Utilities General Manager <br />Subject: Hwy 10 Street Lighting <br />Phone: ?63.441.2020 <br />Fax: 763.441.8099 <br />In December 2006, I assisted your engineering department in developing a plan and cost <br />estimates to replace the lights on Hwy 10. In May of 2008 we removed two street lights on Hwy <br />10 to determine if the existing foundations and electric system are in good enough condition to <br />be reused. After inspecting the foundations and electric system, it appears both are in good <br />condition and can be reused. <br />Per our discussion at the June 10, 2008 Elk River Municipal Utilities Commission meeting, we <br />are to give you a proposal to remove and reinstall these highway lights. We would propose to <br />remove and reinstall the 26 lights (8 single and 18 double arms) on a time and material basis with <br />an estimated cost of $34,000 per the following. <br />1) City of Elk River will purchase the lights, poles, and bases etc., delivered to our facility. <br />We can assist you in the pole selection <br />2) City to provide traffic control and flagmen if necessary. <br />3) Above estimate is based on using existing foundations and wiring. If a foundation cannot <br />be used due to bad anchor bolts or wiring issues develop, ascrew-in steel anchor base <br />plate will be used at additional cost along with wiring modifications. Concrete patching <br />of median may also be necessary at additional cost. <br />4) The existing lighting system is divided into four electric zones. We are proposing to <br />complete one zone at a time to ensure at least part of the Hwy 10 corridor is always lit. <br />5) This work should be completed 28 working days or 5 to 6 weeks. <br />If you need additional information, do not hesitate to call. <br />
The URL can be used to link to this page
Your browser does not support the video tag.