My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.3. SR 12-15-2008
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2008
>
12-15-2008
>
7.3. SR 12-15-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2008 9:14:34 AM
Creation date
12/12/2008 9:14:06 AM
Metadata
Fields
Template:
City Government
type
SR
date
12/15/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Capital Improvement Plan <br />City of Elk River, Minnesota <br />2009 thY1d 2013 <br />Project # IA-03 <br />Project Name Ice Arena Non-Major Building Repair & Maintenance <br />Type Improvement Priority n/a <br />Useful Life 20 years Contact Park & Rec. Director <br />Category Building Maintenance Department Ice Arena <br />O <br />~" <br />i <br />~....-"',t.,.,... <br />... <br />r- , <br />., ~ ~ <br />Kx <br />10 -Lighting system and insulation of a low emissivity -ceiling in the Olympic rink <br />11-Replace condesor in barn <br />Justification <br />current lighting system has metal hyalite fixtures which are outdated and not very efficient. Anew lighting system <br />1d have fluorescent fixtures and would only use about the third of the energy the old medal hyalite system uses. <br />would result in a two to three year payback of the new lighting system. Since we would be installing a new <br />ring system it would be very beneficial to install a low emissivity ceiling. The ceiling would save the City in energy <br />and is projected to have a three to four year pay back. The system traps heat between the insulation and the ceiling <br />would have radiated onto the ice surface, which causes a heavy heat load on the compressors making them run <br />Barn's condenser will be at the end of its life <br />Expenditures <br />Construction/Maintenance <br />and should be replaced before <br />2009 2010 2011 2012 2013 <br />70,000 55,000 <br />or problems arise. <br />Total <br />125,000 <br />Total 70,000 55,000 125,000 <br />Funding Sources 2009 2010 2011 2012 2013 Total <br />Capital Outlay Reserve 25,000 55,000 80,000 <br />Ticket (Sucharge) 45,000 45,000 <br />Total 70,000 55,000 125,000 <br />Page 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.