My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INFORMATION #3 05-13-1996
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1996
>
05/13/1996 - SPECIAL/JOINT
>
INFORMATION #3 05-13-1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:32:19 AM
Creation date
3/12/2003 8:57:57 PM
Metadata
Fields
Template:
City Government
type
SR
date
5/13/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONSULTING ENGINEER <br /> <br />1326 Energy Park Drive <br /> <br />St. Paul, MN 55108 <br /> <br />612-644-4389 <br /> <br />1-800-888-2923 <br /> <br />Fax: 612-644-9446 <br /> <br />May 8, 1996 <br />File: 230-000-00 <br /> <br />Mr. Pat Klaers <br />City Administrator <br />City of Elk River <br />13065 Orono Parkway <br />P.O. Box 490 <br />Elk River, MN 55330 <br /> <br />RE: MAIN STREET BRIDGE RAILING <br /> <br />Dear Mr. Klaers: <br /> <br />CIVIL ENGINEERING <br />ENVIRONMENTAL <br />MUNICIPAL <br />%ANNING <br /> <br />SOLID WASTE <br />STRUCTURAL <br />SURVEYING <br />TRAFFIC <br />TRANSPORTATION <br /> <br />ELECTRICAL/MECHANICAL <br />ENGINEERING <br /> <br />HVAC <br /> <br />ROWER D!STRBUTION <br /> <br />SCADA <br /> <br />SYSTEM CONTROLS <br /> <br />OFFICES IN: <br /> <br />MINNEAPOLIS <br /> <br />PRIOR LAKE <br /> <br />ST. PAUL <br /> <br />WASECA <br /> <br />A few weeks ago, Councilmember Dietz asked me to investigate the cost of installing a <br />pedestrian railing on the south side of the Main Street Bridge. I believe this was in <br />response to a concern by Mr. Doug Dill regarding pedestrians on the south side of the <br />bridge. As you are aware, there are no pedestrian facilities on the south side of the <br />bridge. The sidewalk is located on the north side; therefore, no railing was installed along <br />the south side. <br /> <br />We contacted National Steel Fabricators and requested a price to both fabricate a matching <br />railing for the south side and to install it. The ballpark prices that we were provided with <br />are $45.00 per linear foot to fabricate railing and an installation cost of $30.00 per linear <br />foot. The total bridge length is 275 feet, which results in a total cost for railing on the <br />south side of the bridge of approximately $21,000. <br /> <br />I gave this information to Councilmember Dietz by phone. He requested that I prepare <br />a memo which could be included in the informational packet of a future City Council <br />meeting. <br /> <br />If you have any questions regarding this information, please call. <br /> <br />Sincerely, <br /> <br />MSA, CONSULTING ENGINEERS <br /> <br />Terry J. 'Maurer, P.E. <br /> <br />TJM:tw <br />000-0801 .may <br /> <br />An Equal Opportunity Employer <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.