My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.7. SR 05-13-1996
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1996
>
05/13/1996 - SPECIAL/JOINT
>
5.7. SR 05-13-1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:32:18 AM
Creation date
3/12/2003 8:52:39 PM
Metadata
Fields
Template:
City Government
type
SR
date
5/13/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONSULTINGENGINEERS <br /> <br />1326 Energy Park Drive <br /> <br />St. Paul, MN 55108 <br /> <br />612-644-4389 <br /> <br />1-800-888-2923 <br /> <br />Fax: 612-644-9446 <br /> <br />May 8, 1996 <br />File: 230-297-30 <br /> <br />Honorable Mayor and City Council <br />City of Elk River <br />13065 Orono Parkway <br />P.O. Box 490 <br />Elk River, MN 55330 <br /> <br />RE: HILLSIDE CROSSING II CONSTRUCTION BIDS <br /> <br />ITEM 5.7. <br /> <br />Dear Council Members: <br /> <br />We have tabulated the bids received on Thursday, May 2, 1996, for the public <br />improvements in the Hillside Crossing II development. There were a total of 12 bids <br />submitted. The following list provides the name of the bidder and the amount of their total <br />bid: <br /> <br />CIVIL ENGINEERING <br /> <br />ENVIRONMENTAL <br /> <br />MUNICIPAL <br /> <br />:~OLID WAS! E <br /> <br />SURVEYING <br /> <br />TRAFFIC <br /> <br />TRANSPORTATION <br /> <br />ELECTRICAL/MECHANICAL <br />ENGINEERING: <br /> <br />HVAC <br /> <br />POWER DISTRIBUTION <br /> <br />SCADA <br /> <br />SYSTEM CONTROLS <br /> <br />OFFICES IN: <br /> <br />MINNEAPOLIS <br /> <br />PRIOR LAKE <br /> <br />ST. PAUL <br /> <br />WASECA <br /> <br />Mid-Minnesota Concrete & Excavating <br />Kober Excavating <br />W. B. Miller, Inc. <br />Arcon Construction, Inc. <br />Ryan Contracting, Inc. <br />Northdale Construction <br />Richard Knutson, Inc. <br />Kadlec Excavating, Inc. <br />Brown & Cris, Inc. <br />LaTour Construction, Inc. <br />Bonine Excavating, Inc. <br />Barbarossa & Sons <br /> <br />$505,840.62 <br /> 520,577.69 <br /> 554,287.49 <br /> 558,095.54 <br /> 566,047.90 <br /> 569.263.42 <br /> 573.084.58 <br /> 589770.50 <br /> 602.868.34 <br /> 603.318.39 <br /> 643.347.23 <br /> 661903.38 <br /> <br />As you can see from the number of bidders, there was a substantial amount of interest in <br />this project. Because it was petitioned by the Developer, there was no formal feasibility <br />prepared. However, the low bid is approximately $75,000 under the Engineer's estimate. <br /> <br />Mid-Minnesota Concrete & Excavating has not done similar type work in Elk River or <br />other locations, for that matter. This is a new division and they have just started providing <br />underground construction. We are familiar with the individual who is partner in the finn <br />that will head this division, however. Peter Mechtel has approximately 25 years of sewer <br />and water experience. In the past, he has worked for R. L. Larson Excavating, who has <br />done similar type projects in the City of Elk River over the years. Because of their status <br />as a new division, I have asked both Pete and his partner to meet with Rick Foster to <br />discuss how they plan to attack the project. I have also asked for, and received, a listing <br />of equipment and crews that will be available to work on the project, a listing of <br />subcontractors and materials suppliers, and also a tentative schedule to indicate how they <br />plan to complete the project. <br /> <br />An Equal Opportunity Employer <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.