My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.0 EDSR 12-08-2008
ElkRiver
>
City Government
>
Boards and Commissions
>
Economic Development Authority
>
EDA Packets
>
2003-2013
>
2008
>
12-08-2008
>
6.0 EDSR 12-08-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2008 3:54:35 PM
Creation date
12/8/2008 12:53:45 PM
Metadata
Fields
Template:
City Government
type
EDSR
date
12/8/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Elk River FAST Study <br />~z~8~o8 Draft Schedule <br /> zoo8 zoo9 <br /> Dec Jan Feb Mar Apr May <br /> <br />~.~ Conduct kick-ofF meeting with Economic Development Authority, ~ 12 Jg <br />Planning Commission and City Council <br />~.z Condud kick-off meeting with City Staff <br />i.3 Project Administration <br />• . <br />z.~ Prepare base mapping <br />z.z Identify opportunities and constraints <br /> <br />3.~ Hold orientation meeting with City StafF and core HKGi team <br />3.z Review Draft Assumptions <br />3.3 Develop Draft Project Objectives <br />3.4 Develop (3) General Design Concepts <br /> <br />4.~ Refine land use concept diagrams <br />4.z Prepare roadway connection diagrams <br />4.3 Prepare public improvement/site amenities diagrams <br />4.4 Prepare precedent photos boards displaying finish materials and <br />design parameters <br />4.5 Quantify development potential (Jobs/HH/Market Value) <br />4.6 Assemble concepts in report and presentation form <br />4.7 Conduct review session with City Staff at HKGi offices <br />~..i3 Conduct Key Landowner meetings <br />4.9 Conduct review session with EDA/PC/CC • zl9 <br />4.~o OPTIONAL SERVICE: Conduct Optional Additional Landowner 0 <br />group meetings if required <br /> <br />5.~ Conduct Advisory Panel Workshop focused on applying the outside ~ <br />expertise for the panel toward concept evaluation, refinement and ~ 3l9 <br />inital implementation strategies followed by EDA/PC/CC <br />5.z Hold follow up meeting with City staff at HKGi offices to review the <br />findings of the Advisory Panel Workshop <br /> <br />6.~ Refine concepts and prepare the prefer-ed plan <br />6.z Prepare impact analysis (traffic and infrastructure demand) for the <br />preferred plan: <br />6.3 Prepare implementation mechanisms <br />6.4 Conduct Review meetings with City Staff to review draft materials <br />d di <br />i <br />l <br />i <br />i <br />an <br />scuss <br />mp <br />ementat <br />on strateg <br />es <br />6.5 Conduct review meeting with EDA/PC/CC ~ 4h3 <br />6.6 Refine draft plan <br />-.. ... . <br />7.~ Present draft plan to City Council for review/approval <br />7.z Revise plan based on feedback and submit <br />City Sta$ <br />EDA/PC/CC <br />O Landowner Meetings <br />Advisory Panel <br />City Council <br />-n~cuf ~k~n..1~ ~~1~'~~~' ~~~ <br />Hoisington Koegler Group Inc. ©~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.