Laserfiche WebLink
Evans Avenue - from Main Street to Railroad Drive. The street surface is <br />very narrow and cracked. Drainage from the 1st Street cul-de-sac is also a <br />major issue. <br /> <br />5th Street - Auburn to Highway 10. <br /> <br />Dodge Avenue - from 5th Street to McDonalds. MSA has provided Gary <br />Santwire with a feasibility study on this area. <br /> <br />Baldwin Avenue - from 5th Street to 3rd Street. <br /> <br />3rd Street - from County Road 13 to Baldwin Avenue. Road surface is <br />deteriorating and drainage at the 3rd and Baldwin intersection needs to be <br />addressed. <br /> <br />175th, Tyler, 193rd - (Snake Trail) - Old township road, narrow with poor <br />road surface. <br /> <br />Railroad Drive - (Jackson Avenue to Main Street) Road surface is patched <br />and rough, drainage is poor, parking and sidewalks need improvement and <br />curb and gutter is nonexistent. <br /> <br />This list is to point out some areas in town that are of concern. Staff would <br />like some Council direction regarding these and other street projects. <br /> <br />council:96overly <br /> <br /> <br />