My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.3. SR 05-06-1996
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1996
>
05/06/1996
>
8.3. SR 05-06-1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:32:18 AM
Creation date
3/12/2003 8:25:41 PM
Metadata
Fields
Template:
City Government
type
SR
date
5/6/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Evans Avenue - from Main Street to Railroad Drive. The street surface is <br />very narrow and cracked. Drainage from the 1st Street cul-de-sac is also a <br />major issue. <br /> <br />5th Street - Auburn to Highway 10. <br /> <br />Dodge Avenue - from 5th Street to McDonalds. MSA has provided Gary <br />Santwire with a feasibility study on this area. <br /> <br />Baldwin Avenue - from 5th Street to 3rd Street. <br /> <br />3rd Street - from County Road 13 to Baldwin Avenue. Road surface is <br />deteriorating and drainage at the 3rd and Baldwin intersection needs to be <br />addressed. <br /> <br />175th, Tyler, 193rd - (Snake Trail) - Old township road, narrow with poor <br />road surface. <br /> <br />Railroad Drive - (Jackson Avenue to Main Street) Road surface is patched <br />and rough, drainage is poor, parking and sidewalks need improvement and <br />curb and gutter is nonexistent. <br /> <br />This list is to point out some areas in town that are of concern. Staff would <br />like some Council direction regarding these and other street projects. <br /> <br />council:96overly <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.