My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.6. SR 05-06-1996
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1996
>
05/06/1996
>
5.6. SR 05-06-1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:32:18 AM
Creation date
3/12/2003 8:18:26 PM
Metadata
Fields
Template:
City Government
type
SR
date
5/6/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Patrick Klaers <br />20 March 1996 <br />Page 3 <br /> <br />Revised Construction Document Phase: <br /> <br />When the decision to place the project on hold was made on 18 May 1995, the overall design <br />team was approximately 50% complete with the project; our structural engineers were even <br />further along because of the early structural bid package. <br /> <br />The decision to accept the cost reduction design revisions has affected the work effort of all the <br />design professionals. Wherever possible we built on the previously completed work; however, <br />in many places we were required to make major revisions to completed work or, in some cases, <br />the work was completely omitted. <br /> <br />The Bid Alternates #1 and #2 for the ice equipment have also resulted in an expanded scope of <br />work for both the mechanical and electrical engineers. <br /> <br />Enclosed is a revised fee sheet to be attached to the original contract and to receive your <br />initials for validation. Our professional fee for these revisions is broken down below. We feel <br />the simplest way to handle the change in our contract is to adjust our fees for the Construction <br />Document Phase of the project. <br /> <br />Civil $8OO <br />Structural $4,800 <br />Architectural $6,740 <br />Mechanical/Electrical 4,775 <br /> Total $17,115 <br /> <br />Due to the lack of information and difficulty we have been having in securing information on <br />the used equipment in Atlanta, our mechanical/electrical engineers have requested a one-week <br />extension. RSP as well needs to know the physical size of the used equipment to make sure the <br />new equipment room is of sufficient size. The bid documents will now be available 2 April <br />1996. We will coordinate with M.A. Mortenson on notice and distribution. <br /> <br />a.vailab~my discussions and/or questions. <br /> <br />Enclosure <br />Copy: Pat Parrish <br /> File <br /> <br />LCF/Icf:PJp <br />ic¢\elknverXl0319Icl, doc <br /> <br />Please note that I will be out of the country from 21 March to 31 March on a previously <br />scheduled family vacation. In my absence, Courmey Kuch and/or Bob Lucius will be <br /> <br />/rrincipa~l. LucluS, A.I.A. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.