|
November 20, 1991, application for renewal of the Conditional Use Permit; in
<br />Permitee's February 1, 1993, application for renewal of the Conditional Use
<br />Permit; in Permitee's November 8, 1995, application for renewal of the
<br />Conditional Use Permit; in Permitee's November 2, 1999; and in Permittee's
<br />December 22, 2004, application for renewal of the Conditional Use Permit; all
<br />of which have been provided to the City by the Permittee in support of the
<br />application for this Amended Conditional Use Permit and collectively
<br />describe the Facility authorized by the Permit. The Facility consists of three
<br />(3) integrated components located in the City: (1) A facility for receiving
<br />municipal solid waste and processing it into refuse-derived fuel (Processing
<br />Facility); (2) A facility for the incineration of refuse derived fuel (burn
<br />facility); and (3) The movement of vehicles transporting municipal solid waste
<br />(MSV~, refuse-derived fuel (RDF), rejected municipal solid waste (Rejects),
<br />and incinerated RDF ash. So long as RDF is incinerated in the City, the
<br />conditions of this Permit which relate to the Burn Facility and Residue shall
<br />be in full force and effect. Construction or operation in violation of any of the
<br />material statements of fact, factual information, or representations in the
<br />referenced documents shall be deemed to be a violation of the Permit and all
<br />such documents are considered to be and are hereby made a part of the Permit.
<br />
<br />2.
<br />
<br />--
<br />+
<br />+ 1 1
<br />a
<br />~ „
<br />a
<br />~ «oo
<br />~
<br />'" ~
<br />„ ~ «
<br />'
<br />+l,o
<br />
<br />
<br />D
<br />a
<br />1r~ '1
<br />
<br />'+, 1
<br />~
<br />, 11 b.
<br />
<br />'.lo
<br />1
<br />.l „
<br />
<br />L.~+~,.+; it 1LV
<br />
<br />.1 F,
<br />
<br />'+L.
<br />
<br />+L,
<br /> b
<br />1 L. '++ ,1 ~
<br />1. AT r
<br />«+L, C+
<br />..+o~
<br />D,.,, ~
<br />.o« (`
<br />'
<br /><
<br />+1, +L.o ..
<br />~
<br />.. „.,1
<br />~
<br /> - ~ a 11 L11 Vl r.,
<br />
<br />
<br />D
<br />
<br />_
<br />-'+ T .1.1'+
<br />' y
<br />+1, 1
<br />L. ~
<br />11 1.
<br />~ «+1, ~
<br />o.l r
<br />+., ,. .;.
<br />«
<br />lo ., 1,
<br />.,«.1
<br />r ' Y r
<br />
<br /> +1, ~ ' 1'+, '+ '+L . L, .,«.1 ,. «f n~a « «L.
<br />., « .~,.1 .1«.
<br />., o 0
<br /> l" l
<br />l '
<br />n
<br />z i i r
<br />C•,«., ~
<br />1.,«.a~ o,7 .,
<br />.,.,
<br />« o
<br />^ ,:+1~
<br />r ncsr~
<br />irvr2rsp
<br />vv cs~ xig~-
<br />vi-v xi ~ ~
<br />~J J Y
<br />V{4 y V
<br />
<br />7 7 1
<br />1 N[1 [.H
<br />3. X11 +•, •+. a + + +«. +• 1., ~a •~• +• ~+0,11+.
<br />J 1J KU ~/
<br />r > ci~i~~' a„~ci-d-its--'u"i-`c-ui^cc°~J 11 ..~
<br />4. Any new building plans and specifications must be approved by the City
<br />Building Inspector and Fire Chief.
<br />5. Approval of driveway entrances, if needed, on State and County highways
<br />shall be secured from the appropriate agencies and filed with the City
<br />Environmental Administrator prior to issuance of any building permit. Street
<br />lighting and acceleration and deceleration lanes for Highway 10 at the
<br />S:\PLANNING MAIN\Case Files\CUP\CU 0~-22 Resource Recovery Technologies\CUP
<br />
|