My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.3. SR 11-03-2008
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2008
>
11-03-2008
>
5.3. SR 11-03-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2008 2:06:32 PM
Creation date
10/30/2008 2:06:32 PM
Metadata
Fields
Template:
City Government
type
SR
date
11/3/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REQUEST FOR ACTION <br />To Item Number <br />City Council 5.3. <br />Agenda Section Meeting Date Prepared by <br />Administration November 3, 2008 Bill Maertz, Parks and Recreation <br /> Director <br />Item Description Reviewed by <br />Request for Authorization to Widen Book Drop Driveway at Lori ohnson, Ci Administrator <br />Library Reviewed by <br />Action Requested <br />Request for authorization to widen book drop driveway at library <br />Background/Discussion <br />The drive through book drop at the library has a tight radius that is difficult for some drivers to navigate. <br />This has resulted in some scuffing of the building. The Library Board requested KITE Architects to <br />review the original plans and develop a solution. <br />At KKE's expense, AJA Engineering developed modifications to the book drop driveway. In addition to <br />widening the lane, a bollard will be installed to protect the building. Attached is a plan set and <br />specifications. Plans, specifications, and the RFP were prepared at no cost to the City. City staff met AJA <br />staff onsite and filmed a large truck using the proposed new route successfully. <br />Two quotes have been received: <br />FPI Paving Contractors Inc. - $12,925 <br />Buck Blacktop Inc: - $14,390 <br />Staff is requesting authorization to contact with FPI Paving Construction Inc. for a total of $12,925 <br />The library reserve fund balance has sufficient funds to fund this project. Once construction is complete, <br />the scuffed wall panels will be straightened and cleaned. <br />Financial Impact <br />X12,925 from the library fund reserves. <br />Attachments <br />^ RFP for Construction <br />^ Plans and Specifications <br />^ Library Fund Balance Sheet <br />C:ADocuments and Settings-\jmiIlex\Loca1 Settings\T'empoxary Ineexnet Files\OLI~3E\Request to Widen Booh Dxop Driveway.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.