Laserfiche WebLink
Page 4 <br />(09) Reclamation <br />• a. Reclamation shall be implemented on an annual basis <br />pursuant to the reclamation plans submitted by the <br />operator. <br />b. Each year a plan for that year's reclamation shall be <br />approved by the Building and Zoning Administrator prior <br />to issuance of the annual mineral excavation license. <br />c. A $5,000 dollar letter of credit, bond, or deposit, approved <br />by staff, shall be required prior to the issuance of the <br />annual license to cover the forthcoming year's <br />reclamation. <br />d. The reclamation shall include top soil from the site being <br />preserved and put back into place after mining. <br />e. The vegetation established for reclamation must be <br />maintained until it is self sufficient. <br />f. Contours, finished grades, details of erosion control <br />• methods, and settling ponds, shall comply with the plans <br />submitted and the City ordinance at the time of <br />reclamation. <br />(10) Traffic <br />a. Except for localized jobs, traffic through Elk River <br />associated with this operation shall be limited to U.S. <br />Highway 10 and 169. <br />(11) Dust Control <br />a. A permit from MPCA regarding air emissions shall be <br />obtained when required and particulate emission <br />standards shall be met by the operation. <br />b. All equipment shall be located as to reduce dust to <br />adjacent properties. <br />c. Water, but no chemical agents, shall be used to control <br />dust as necessary. <br />• <br />cupSHIELlbz/sr <br />