Laserfiche WebLink
03/22/95 14:33 $812 559 2202 BA LIESCH ~003/A03 <br />Page 2 <br />March 22, 1995 <br />Page 11 of the application indicates that wash water used at the facility will continue to be • <br />obtained fmm the on-site pond and adjacent well as necessary. According to the application. <br />water level monitoring will occur during the pumping season to assure that drawdown of the <br />water table does not create pmblems with nearby wells. The application does not identify the <br />water level monitoring points. It is grudeat that the specific monitoring goints and frequency <br />of monitotng be identified. Water level monitoring should be initiated before pumping seasoa <br />begins and several times during the First week. Thereafter, monitoring should occur two times <br />per month with the option to increase monitoring intervals in the case of climatic dry periods, <br />which would likely cause a corresponding drop in the elevation of the water table. The water <br />level monitoring should itxlude the pond, and the three nearest wells previously identified for <br />water quality sampling including Northern Con-Agg Wells ~1 (well "E"), and #2 (well "F"), and <br />the Nemeth well. <br />Please call us if you have any questions or comments. Thank you. <br />/ulPrj/GOID0001/grav.wp <br />• <br />• <br />B.A. LIESCH ASSOCIATES, INC. 1340015TH AvENUE NORTH MINNEAPOLIS. MINNESOTA 554a1 <br />