Laserfiche WebLink
Page 9 <br />17. Groundwater protection measures shall include: <br />• a. The operator shall file with the City and emergency spill <br />response plan. The operator shall adhere to this plan in the <br />event there is a spill. <br />b. The operator shall provide the Fire Department with a copy of <br />their flammable or hazardous materials. <br />c. Fuel tanks shall be above ground, properly diked, and registered <br />with MPCA. <br />d. All incidences that have the potential to adversely affect <br />groundwater, including but not limited to spills, shall be <br />verbally reported to the City within 24 hours. This verbal <br />notification shall be followed up in writing within 4 working <br />days. <br />e. A water appropriation permit from the Department of Natural <br />Resources must be obtained. <br />f. The wells located at the Julius Nemeth residence, the scale <br />house and the wash operation, shall be monitored once a year <br />• for diesel range organics (DRO). If mining is to occur below the <br />water table, the above wells must be monitored for DRO prior to <br />excavation activities commencing and after their cessation. <br />Further, in the event of a spill, appropriate water tests will be <br />taken until the spill is deemed clean. <br />g. Groundwater levels shall be monitored in the wells located at <br />the Julius Nemeth residence, the scale house, .and the wash <br />operation, prior to the start of wash operations and an <br />additional 3 times during the first week of said operation to <br />predict the long term effects of the pump operation. Thereafter, <br />the aforementioned wells shall be tested a minimum of twice per <br />month, said frequency to be increased during dry periods. This <br />routine testing shall also be done for the water recycling pond. <br />h. Water usage by mining activity shall not adversely affect <br />adjacent residential wells. Mitagative measures may include, <br />but are not limited to, curtailing of pumping activities until <br />water levels return. <br />i. The appropriate storm water permit shall be obtained by the <br />• operator from A4PCA. <br />s:planning:pc:95~04 <br />