Laserfiche WebLink
Mr. Scott Hadicker <br />January 27, 2003 <br />Page Two <br /> <br />· An easement is needed on the north end of Block 1, Lot 3 in order to accommodate for the <br /> drainage across Lot 3 from Lot 2. <br />· The new ground elevations do not show that a swale was graded along lot lines. <br />· The drainage pattern in the northeast corner of Lot 3, Block I needs to be reviewed and <br /> revised to follow the correct elevations. <br /> <br />Specifications <br /> <br />· The specifications have been reviewed and are acceptable. <br /> <br />If you have any questions regarding any of these comments, please call. <br />Sincerely, <br /> <br />Howard R. Green Company <br /> <br />Cc: Bdan Kallio <br /> Pioneer Engineering <br /> 625 Hwy 10 NE <br /> Blaine, MN 55435 <br /> <br /> Jim Brown <br /> Cascade Land Co. <br /> 555 Third St. NW <br /> Elk River, MN 55330 <br /> <br />Ltr-012403-Hadicker <br /> <br /> <br />