Laserfiche WebLink
n _ 1. _. __,.41_,. <br />V <br />• Summary of assembled base data <br />• Summary of kick-off meeting <br />• Description of information gathered during site visit <br />• Brief overview of case studies of progressive business park developments <br />• Summary of meeting with adjacent land owners <br />• Statement of goals <br />• Drafts of three land use scenarios, preliminary sustainability principles, and <br />preliminary design guidelines. <br />• Summary report outlining findings and preferred development scenario, <br />sustainability principles, and design guidelines (one hard copy plus a compact <br />disk containing the report, full size pdf or other native format copies of all <br />illustrations, summaries of meetings and site visits, and drafts of land use <br />scenario options) <br />Stage 2: Development Strategies <br />There are several tasks which might help Elk River become better positioned to <br />market the project once a preferred direction for development is agreed upon. <br />These optional elements can be performed at the discretion of Elk River. <br />T G <br />11.KDevelop a timeline and phasing strategy for development by imagining a <br />20-year goal for the site and working backward through the necessary steps <br />to achieve that goal. <br />12. Create a checklist to assess the potential for projects on the site to achieve <br />LEED® certification. <br />13. Develop strategies for local or on-site energy production. Developing a <br />framework for providing sustainable energy to the site will significantly impact <br />the potential of the site. <br />14. Coordinate with a marketing specialist to create a brochure that can be used to <br />communicate the goals for the project to potential developers and tenants. <br />15. Present strategies for implementation based on the preferred scenario to the <br />EDA, city council, and planning commission. <br />T,_I_-~- -41 - <br />• Summary of timing and phasing strategy <br />• LEED assessment checklist <br />• Memorandum describing potential energy production strategies <br />• Graphics and other materials required by marketing specialist <br />The work described above is based on our current understanding of the project, <br />but we will modify the activities as required to more directly respond to the City <br />of Elk River's needs. <br />www.LHBcap.can <br />Page 4 <br />